  • INTERLOCKING STABILIZED SOIL BLOCKS CONSTRUCTION COSTS SAVINGS IN KENYA.

    INTERLOCKING STABILIZED SOIL BLOCKS CONSTRUCTION COSTS SAVINGS IN KENYA.

    Interlocking Stabilized soil blocks are walling blocks made from compressed soil. They are just as hard and as water-proof as stone. Stone is made when soil is compressed by forces of nature while the Interlocking Stabilized Soil blocks are made when the soil is artificially compressed.
    Interlocking Stabilized soil blocks are artificially compressed using either a manual or diesel-operated pressing machine to a pressure of between 20 to 40 kg/cm2.

    COMPRESSIVE STRENGTH.

    Quarry stone has a compressive strength of between 2 to 5 N/mm2 depending on the type of stone which varies from region to region.
    Interlocking Stabilized soil blocks have a compressive strength of 2.5N/mm2.
    This shows that they compare well to quarry stone in terms of strength.
    Reinforced concrete has a much higher compressive strength that exceeds 15 to 20N/mm2 depending on the mix ratio of cement; sand; ballast.

    COST

    STABILISED CEMENT BLOCK COST BREAKDOWN.

    Assuming an average price of KES 750 for a 50kg bag of cement, and KES 350 to 400 for unskilled labour per day, the cost of producing 1 meter squared is as below:
    http://www.a4architect.com/2011/10/12/a4architect-com-construction-material-price-index/

    CEMENT-KES 7 per brick
    LABOUR to manufacture brick-KES 4 per brick
    LABOUR to make wall-assuming 1 fundi and 1 assistant at a total of KES 1,100 per day with a minimum of 500 bricks per day.-KES 0.4 per brick.
    TOTAL=KES 11.4 per brick.

    1 M2 of walling will have an average of 33 bricks.

    The total amount for 1 m2 of Stabilized soil walling will be KES 378 per m2.
    The above estimate assumes that the soil is freely available at the site.

    If the soil is bought, the cost will vary as below:

    Assuming soil is bought and transported to the site at a cost of KES 500 per ton, this translates to 225 bricks per ton costing KES 0.3 per brick.
    There will be an additional cost of KES 0.3 X 33 bricks per m2=KES 10 per m2.
    This will total KES 388 per m2.

    FREE SOIL

    In Nairobi and its environs, since there are large construction projects requiring deep foundation excavations, soil can be delivered to the site for free since the large building owners are required to dump the soil in far away located approved council dumping sites hence more convenient for them to deliver to a nearby site.

    NO NEED FOR JOINING MORTAR AND PLASTER

    Stabilized soil blocks eliminate the need for joining cement mortar in between the blocks. It also eliminates the need for plaster. It’s however recommended to paint is externally using water-proof varnish to make it more water –resistant.
    Specific sections can be painted using contrasting colors to create creative interior wall patterns.

    MASONRY STONE COST BREAKDOWN

    Machine-cut stone delivered around Nairobi costs between KES 60 to KES 70 per block.
    In 1 m2 of wall, there are 13 stones. This totals to KES 60 x 13=KES 780 per m2.
    The stones require cement mortar for joining. Each m2 requires approximately 1m2 of cement mortar at a cost of KES 200 per m2.
    This adds the amount to KES 980M2.

    Masonry walling requires plaster on the interior surface and key finishing on the exterior surface. This costs a further KKES 200 per m2, adding the cost to KES 1,180 per m2.

    After plastering, masonry walling will need paint since the dull grey color of cement cannot be left bare compared to the reddish stabilized soil block color.
    Paint costs a further KES 200 per m2, totaling the amount of masonry walling to KES 1,380 per m2.

    COMPARISON OF PRICES.

    Masonry walling costs 256% more than Interlocking Stabilized soil block walling.

    In an average bungalow, the total walling costs compared to the total cost of construction is 15% .

    The 256% difference in walling between use of masonry stone versus use of interlocking stabilized soil block happens only in the 15% of the total construction cost hence not being strongly felt.

    For example, in the www.a4architect.com Diamond House design, the phase 1 [49m2] costs KES 853,000 to construct using masonry stone.

    If the masonry stone is replaced with interlocking stabilized soil block, this 49m2 house will cost KES 796,000, representing a savings of KES 57,000.

    CONCLUSION.

    To achieve maximum results in terms of cost savings in construction, a holistic approach whereby all elements of construction are taken into consideration, from foundation to walling, roofing, windows, finishes, external works.
    This holistic approach to design has been researched and compiled as the www.a4architect.com Diamond House methodology.
    http://www.a4architect.com/diamond-house-plan-cost/

    Architect Francis Gichuhi Kamau
    inof@a4architect.com
    www.a4architect.com
    +254721410684

  • COMPARISON BETWEEN CONSTRUCTING A MAISONETTE VERSUS A BUNGALOW.

    COMPARISON BETWEEN CONSTRUCTING A MAISONETTE VERSUS A BUNGALOW.

    Construction costs between maisonette types versus bungalow types of the same plinth area are more or less equal.

    FOUNDATION.

    Assuming the maisonette will have 50m2 of ground floor and 50m2 of first floor plinth area, there will be savings on the foundation costs since the maisonette will have a foundation that is half the size of the bungalow which will have all the 100m2 area on the ground floor.

    Foundation costs between 10 to 20 % of the total cost of construction so if the foundation quantities are halved, then the cost of construction is also reduced.

    ROOF.

    The maisonette will also have half the roof quantities compared to a bungalow type which will have all the 100m2 plinth area to be roofed.
    Roofing costs around 15% of the total cost of construction. If this quantity is halved, then the costs are reduced.

    SUSPENDED SLAB ON FIRST FLOOR.

    A bungalow type of house does not have an extra suspended reinforced concrete slab for the first floor level. This translates to a saving compared to a maisonette type that has the extra cost of the suspended slab.
    For a 100m2 maisonette, the suspended slab will cost an average of an additional KES 100,000.

    GROUND LEVEL LAND SAVED FOR FUTURE USAGE.

    A maisonette will also save on the footprint ground level space in that the house owner can in future utilize the space for additional construction, agriculture or landscaping as opposed to a bungalow type.

    AESTHETICS.

    Aesthetically speaking, maisonettes due to their elevated shape look more imposing than their bungalow type counterparts.

    SECURITY.

    Maisonettes also offer a better psychological assurance of security since the bedrooms are located on the first floor level which is not easy for burglars to access as opposed to bungalow types.

    CLASS.

    In terms of class, maisonettes will appear more expensive and classy than the same sized bungalow, hence increasing the house owner’s social status among his /her peers.

    LABOUR COST.

    Due to the need for construction materials to be transported to the ground floor, there will be a slight increase in the cost of labour for maisonette types as opposed to bungalows.

    LAND COST.

    In areas where an eighth of land costs more than KES 1,000,000, this means the cost per m2 of land is above KES 2,000. The cost of constructing a suspended first floor slab is also a minimum of KES 2,000. Therefore, by building a suspended slab on the first floor, you will have added more surface area to your plot at an equal or lower cost than the cost of your land.

    If the land cost is lower than KES 1,000,000 per an eighth, then this means that the cost of land is lower than the cost of the first floor slab so it would be more feasible to build a bungalow that eats up a larger ground floor footprint as opposed to a maisonette which the slab will cost more than the land cost.

    CONCLUSION.

    Therefore, the choice between a maisonette and a bungalow house type can be guided and advised by the above issues.

    Architect Francis Gichuhi kamau
    www.a4architect.com
    info@a4architect.com
    +254721410684

  • DIAMOND HOUSE AT KISERIAN

    DIAMOND HOUSE AT KISERIAN

    This Diamond House is located at Kiserian opposite Kiserian PCEA Church.

    From DIAMOND HOUSE, KISERIAN

    This is Phase 1 of the 3 –phased Diamond House.

    The 1 bedroomed Phase 1 has been added an extra bedroom to achieve 2 bedrooms .

    View the Google Map below

    http://maps.google.commaps/ms?msid=205617053586273466800.0004aa0f457b0317571df&msa=0

    [googlemaps http://maps.google.com/maps/ms?vpsrc=1&ctz=-180&ie=UTF8&msa=0&msid=205617053586273466800.0004aa0f457b0317571df&t=h&ll=-1.425908,36.680643&spn=0,0&output=embed&w=425&h=350]

    The Kiserian Diamond House was designed by www.a4architect.com and constructed between May 2011 and July 2011.
    The House finishes are being constructed in phases and each phase is dependent on the financial ability of the owner at the particular moment.

    From DIAMOND HOUSE, KISERIAN

    COSTS

    As at October 21st 2011, the total costs spent are in the range of KES 850,000. This includes external fencing, external toilet , bathroom and water reticulation and KPLC electricity costs.
    This also includes heavy gauge steel reinforcement on the windows for added security and heavy gauge steel doors. Also, the floor has been finished with high quality ceramic tiles and the floor to ceiling height slightly extended to give more interior space for comfort.

    REMAINING WORKS.

    External walling will be keyed to the house owner’s taste.
    Once the external finishes are complete, the house will increase its aesthetic appearance further as shown in the Diamond House version 2.4 images below.

    DIAMOND HOUSE VERSION 2.4

    From DIAMOND HOUSE VERSION 2.4

    Diamond House version 2.4 is the latest version designed in October 2011 and will be constructed in Ruiru, off Thika road at Murera farm area.

    OBJECTIVE: HOUSING AT A COST OF LES THAN KES 1M IN KENYA.

    The main objective of the Diamond House is to achieve housing costs of less than KES 1M .
    The Kiserian Diamond House Phase 1 contains 2 separate bedrooms, living room, kitchen and bathroom.
    All these spaces have been achieved at a cost of KES 850,000. Therefore, the objective of provision of housing at a cost lower than KES 1m has been achieved.

    CUSTOMISATION OF THE DIAMOND HOUSE

    The Kiserian Diamond House has been customized in the following areas:
    Roof: the roof has been changed to hip style as per the owner’s taste.
    Windows: the windows are reinforced with heavy gauge steel to improve the security situation .
    Doors; the doors are made of heavy gauge steel so as to increase the security levels.
    Floor finishes; the floors are finished with high quality ceramic tiles.
    These alterations have slightly increased the overall cost of construction form the estimated KES 676,000 to KES 850,000.

    CONCLUSION

    Housing at a cost of less than KES 1M for a 2 bedroomed unit is an achievable dream in Kenya. This can be achieved as shown in the Kiserian Diamond House.
    This is achieved through
    1. Use of creative construction technology
    2. Phased design: careful floor layout design that makes use of all the space without any wastage
    3. Use of labour based procurement method.

    Architect Francis Gichuhi Kamau
    www.a4architect.com
    +254721410684
    /table

  • CONSTRUCTION OF RENTAL UNITS ON A 40 FT BY 60 FT PLOT

    5LEVELS- 2 UNITS PER FLOOR
    Cost Item

    Kshs

    %

    Land

    1,500,000.00

    7.915567282

    Preliminary

    200,000.00

    1.055408971

    Construction

    15,000,000.00

    79.15567282

    External Works

    450,000.00

    2.374670185

    Contingency

    300,000.00

    1.583113456

    Professional fees

    1,200,000.00

    6.332453826

    Project Management fees

    300,000.00

    1.583113456

    Financial Charges[16 % of construction cost]

    0.00

    0

    Total

    18,950,000.00

    100

    Financing Plan

    Kshs

    %

    Developer[Land,,Professional & Project Management fees]

    3,000,000.00

    15.83113456

    Debt Finance

    15,950,000.00

    84.16886544

    Total

    18,950,000.00

    100

    PROFESSIONAL FEES BREAKDOWN
    ARCHITECTURAL-6% OF TOTAL COST

    INCEPTION-0%

    0%

    0

    OUTLINE PROPOSALS-1%

    1%

    150000

    SCHEME DESIGN-1.5%

    1%

    150000

    DETAILED DESIGN-2%

    2%

    300000

    SUPERVISION-1.5%

    1.50%

    225000

           825,000.00
    ALL CONSULTANTS-10% OF TOTAL COST

    INCEPTION-0%

    0%

    0

    OUTLINE PROPOSALS-1%

    1%

    150000

    SCHEME DESIGN-3%

    3%

    450000

    DETAILED DESIGN-3%

    3%

    450000

    SUPERVISION-3%

    3.00%

    450000

       1,500,000.00
    RETURN ON INVESTMENT[excluding cost of land]
    RENT-KES 15,000 per month for 10 units

    150000

    Annual rent        1,800,000.00
    Construction cost

    15,950,000.00

    Number of months to repay

    106.3333333

    Number of years to repay

    8.861111111

    REMARKS
    With an annual rent increment of 10%, the building will ROI within less thn 8 years hence a viable investment.
    With the same repayment period of 8 years for both Ground floor only construction and Ground floor + 4 levels,
    and potential for building to attract constant regular tenancy, construction of the complete G+4 levels is also
    a viable option.

     

  • DEVELOPMENT OF RENTAL UNITS ON A 60 X 40 FEET PLOT NEAR MAIN ROAD.

    DEVELOPMENT OF RENTAL UNITS ON A 60 X 40 FEET PLOT NEAR MAIN ROAD.
    PLOT SIZE-APPROX. 40X60 FT.
    GROUND FLOOR 2 UNITS
    Cost Item

    Kshs

    %

    Land

    1,500,000.00

    30.06012024

    Preliminary

    40,000.00

    0.801603206

    Construction

    3,000,000.00

    60.12024048

    External Works

    90,000.00

    1.803607214

    Contingency

    60,000.00

    1.20240481

    Professional fees

    240,000.00

    4.809619238

    Project Management fees

    60,000.00

    1.20240481

    Financial Charges[16 % of construction cost]

    0.00

    0

    Total

    4,990,000.00

    100

    Financing Plan

    Kshs

    %

    Developer[Land, Professional & Project Management fees]

    1,800,000.00

    36.07214429

    Debt Finance

    3,190,000.00

    63.92785571

    Total

    4,990,000.00

    100

    PROFESSIONAL FEES BREAKDOWN
    ARCHITECTURAL-6% OF TOTAL COST

    INCEPTION-0%

    0%

    0

    OUTLINE PROPOSALS-1%

    1%

    30000

    SCHEME DESIGN-1.5%

    1%

    30000

    DETAILED DESIGN-2%

    2%

    60000

    SUPERVISION-1.5%

    1.50%

    45000

           165,000.00
    ALL CONSULTANTS-10% OF TOTAL COST

    INCEPTION-0%

    0%

    0

    OUTLINE PROPOSALS-1%

    1%

    30000

    SCHEME DESIGN-3%

    3%

    90000

    DETAILED DESIGN-3%

    3%

    90000

    SUPERVISION-3%

    3.00%

    90000

           300,000.00
    RETURN ON INVESTMENT[excluding cost of land]
    RENT-KES 15,000 per month for 2 units

    30000

    Annual rent               360,000.00
    Construction cost

    3,190,000.00

    Number of months to repay

    106.3333333

    Number of years to repay

    8.861111111

    With an annual rent increment of 10%, the building will ROI within less than 8 years hence a viable investment.
    5LEVELS- 2 UNITS PER FLOOR
    Cost Item

    Kshs

    %

    Land

    1,500,000.00

    7.915567282

    Preliminary

    200,000.00

    1.055408971

    Construction

    15,000,000.00

    79.15567282

    External Works

    450,000.00

    2.374670185

    Contingency

    300,000.00

    1.583113456

    Professional fees

    1,200,000.00

    6.332453826

    Project Management fees

    300,000.00

    1.583113456

    Financial Charges[16 % of construction cost]

    0.00

    0

    Total

    18,950,000.00

    100

    Financing Plan

    Kshs

    %

    Developer[Land, Professional & Project Management fees]

    3,000,000.00

    15.83113456

    Debt Finance

    15,950,000.00

    84.16886544

    Total

    18,950,000.00

    100

    PROFESSIONAL FEES BREAKDOWN
    ARCHITECTURAL-6% OF TOTAL COST

    INCEPTION-0%

    0%

    0

    OUTLINE PROPOSALS-1%

    1%

    150000

    SCHEME DESIGN-1.5%

    1%

    150000

    DETAILED DESIGN-2%

    2%

    300000

    SUPERVISION-1.5%

    1.50%

    225000

           825,000.00
    ALL CONSULTANTS-10% OF TOTAL COST

    INCEPTION-0%

    0%

    0

    OUTLINE PROPOSALS-1%

    1%

    150000

    SCHEME DESIGN-3%

    3%

    450000

    DETAILED DESIGN-3%

    3%

    450000

    SUPERVISION-3%

    3.00%

    450000

       1,500,000.00
    RETURN ON INVESTMENT[excluding cost of land]
    RENT-KES 15,000 per month for 10 units

    150000

    Annual rent           1,800,000.00
    Construction cost

    15,950,000.00

    Number of months to repay

    106.3333333

    Number of years to repay

    8.861111111

    REMARKS
    With an annual rent increment of 10%, the building will ROI within less than 8 years hence a viable investment.
    With the same repayment period of 8 years for both Ground floor only construction and Ground floor + 4 levels,
    and potential for building to attract constant regular tenancy, construction of the complete G+4 levels is also
    a viable option.

     

  • LAND OWNERSHIP IN RWANDA. COMPARISON TO KENYA

    LAND OWNERSHIP IN RWANDA. COMPARISON TO KENYA

    The Rwanda land ownership is regulated by the Organic Land Law of 2005.
    There is no difference in the Law between Rwanda Nationals and Foreigners.
    All land in Rwanda belongs to the State, the Districts and the Cities. These Public institutions then lease out the land to individuals or companies for a period of 99 years.

    In Kenya, all land belongs to the State too. The Government allocates then leases the land to individuals or companies for a period of 99 years .
    In Kenya, foreigners can only own 99 year freehold land.

    OBTAINING LEASE TITLE IN RWANDA

    The procedure is as follows:

    An individual or Company duly registered in Rwanda visits District Office, and provides the below documents:

    Proof of Identity[passport], Company Registration, Deed plan, Tax clearance certificate, sale/purchase agreement, previous title deed, property valuation report, marriage/celibacy certificate, land lease and transfer fees payment receipt.
    This process costs approximately KES 14,000.
    This procedure takes 7 to 19days from start to completion.

    COMPARISON TO OBTAINING LEASE IN KENYA

    In Rwanda, the population is small compared to Kenya. The Rwanda Civil service is effective and very reliable, maybe due to computerization, better salaries and less work load than the Kenyan counterparts.

    In Kenya, the Ministry of Lands employees use manual methods, have more workload and lesser salaries resulting to inefficiencies.
    This results to a higher cost of obtaining title and a longer time-a minimum of 30 days.

    LAND DISTRIBUTION

    In Kenya, only 20% of land is arable. 10% of the population owns most of the arable land.
    In Rwanda, there are 390 people per Km2 of Land, thereby making it one of the mostly highly populated countries in the World.
    In Rwanda, 24% of the population control 70% of the arable land.

    FOREIGN OWNERSHIP OF LAND

    With the promulgation of the new constitution in Kenya, foreigners are now allowed to own 99 year leasehold title land.
    Land that was issued by the British Colonial Government in the early 1900s for a leasehold period of 999 years will also be affected.
    This will now be reduced to 99 years.

    In Kenya, the Land Control Board sets out the mechanisms to identify land ownership and advice/issue clearance on the same to be effected by the Registrar of Lands.
    In Kenya, companies that have directors who are not Kenyan nationals are also not allowed to own freehold land.

    Freehold land ownership is exclusively for Kenyan citizens.
    After the promulgation of the new Kenya constitution in August 2010, all freehold land in Kenya owned by foreigners reverted to State ownership whereby the State can now lease the same the land to citizens and foreigners for a period of 99 years.

    In Rwanda, there is no statute of law that discriminates against foreign ownership of land.

    LAND LAWS

    In Kenya, the Land Laws are very detailed and cover all areas of land ownership comprehensively.
    In Rwanda, the Land Laws are not as detailed and very many sections are left out to a wide array of interpretation.

    BUILDABLE AREA

    In Kigali, only approximately 50% of land is buildable. The rest is made up of rivers, marshland and very steep slopes. Therefore, the Local Authority encourages developers to build high density developments several storeys high. This is effected using zoning controls whereby areas are zoned for high density high rise constructions.

    In Kenya, the Local Authorities discourage developers form constructing high rise buildings. Approval for a high rise building in Nairobi and its environ is a tedious process, with the Local Authority trying all ways and methods to scale a developer’s building to a lower density.

    This has resulted to situations whereby developers have been pushed to a corner to use all ways and methods possible to obtain high rise approvals. The land price in Nairobi is very high; therefore, for developers to make a return on their investments, they have to build high.

    This has resulted to creating avenues for corruption whereby developers fins that if they bribe the local authorities, they will be allowed to construct more storeys higher and in return, make a profit.

    In Rwanda, it’s the other way round. The Rwanda Government encourages high density high rise construction so as to make maximum use of the available land. This way, there are no situations necessary to encourage developers to offer bribes since they are encouraged to build more storeys hence higher profits.

    Architect Francis Gichuhi Kamau
    www.a4architect.com
    +254721410684

  • A4ARCHITECT DIAMOND HOUSE PLAN COST

           
    DIAMOND HOUSE EXTENDABLE DESIGN FLAT ROOF VERSION   SLOPED ROOF VERSION
           
      FLOOR AREA M2    
           
    PHASE 1 ONE BEDROOMED 45M2

    45

     

    45

           
     

     
         
    https://picasaweb.google.com/100670517898592718535/DIAMONDHOUSEFLATROOF?authuser=0&feat=embedwebsite#      
      ESTIMATED COST   ESTIMATED COST
    LOW COST MATERIALS-45M2        900,000.00         1,125M
    MIDDLE COST MATERIALS-45M2    1,35M         1,35M
    HIGH COST MATERIALS-45M2    1,8M         1,8M
           
           
    PHASE 2 TWO BEDROOMED 67M2

    67

     

    67

           
     

     
    https://picasaweb.google.com/100670517898592718535/DIAMONDHOUSEFLATROOF?authuser=0&feat=embedwebsite# ESTIMATED COST   ESTIMATED COST
           
           
    LOW COST MATERIALS-67M2    1,34M         1,675M
    MIDDLE COST MATERIALS-67M2    2,01M         2,01M
    HIGH COST MATERIALS-67M2    2,68M         2,68M
           
           
    PHASE 3 THREE BEDROOMED 92M2

    92

     

    92

     

     
         
    https://picasaweb.google.com/100670517898592718535/DIAMONDHOUSEFLATROOF?authuser=0&feat=embedwebsite# ESTIMATED COST   ESTIMATED COST
           
    LOW COST MATERIALS-92M2    1,84M         2,3M
    MIDDLE COST MATERIALS-92M2    2,76M         2,76M
    HIGH COST MATERIALS-92M2    3,68M         3,68M
    DIAMOND HOUSE RONGAI VERSION
     

     DIAMOND HOUSE RONGAI TYPE THREE BEDROOMED 100M2
     
           
           
      ESTIMATED COST  
    https://picasaweb.google.com/100670517898592718535/RONGAITUALADIAMONDHOUSEVersion20#      
    LOW COST MATERIALS-100M2    2M  
    MIDDLE COST MATERIALS-100M2    3M  
    HIGH COST MATERIALS-100M2    4M  

     

  • A4ARCHITECT.COM CONSTRUCTION MATERIALS PRICE INDEX,KENYA,RWANDA

    A4ARCHITECT.COM CONSTRUCTION MATERIAL PRICE INDEX SEPTEMBER 2011

             
      SEPTEMBER 2011 PRICES KES     % INCREASE
      KENYA PRICE  [Nairobi] RWANDA PRICE[Kigali]  DIFFERENCE  
             
    LABOUR        
             
    Foreman

    1100

    1200

    100

    9.09091

    Builder-Fundi

    700

    700

    0

    0

    Builder’s Assistant-Mtu wa Mikono

    350

    350

    0

    0

             
    Anti Termite 1 ltr [Mlolongo A&B Hardware]

    2200

         
             
    Polyethene roll. [Mlolongo A&B Hardware]

    4500

         
             
    Masonry stone-rough[Kasarani junction traders]

    40

         
    Masonry Stone-machine-cut[Kasarani junction traders]

    60

         
    Walling Brick per m2

    1000

    2000

    1000

    100

    Walling cncrete block per m2

    1300

    3000

    1700

    130.769

             
    Cement-50kg bag.

    750

    1500

    750

    100

             
    SAND per tonne

    1700

    2300

    600

    35.2941

             
    BALLAST per tonne

    1500

    2300

    800

    53.3333

             
    Steel Reinforcement bars.        
             
    Y10

    690

         
    Y12

    970

    1000

    30

    3.09278

    Y16

    1750

    2000

    250

    14.2857

             
    ROOF        
             
    Timber 6×2 cypress [per LM]

    240

    145

       
    Hardwood 250mm by 10mm per LM  

    1300

    1300

     
             
    Clay roof tile per m2[Ruliba Clays, Kigali]

    500

    900

    400

    80

    Concrete Roof tile per m2[Mareba]

    650

         
             
    Iron sheet-Gauge 30 per m2[Kiserian Hardware shop next to KCB]

    280

         
    Gauge 32-per m2

    250

         
             
    Stone-coated steel roofing tiles

    2100

         
             
    WINDOWS        
             
    Alluminium window frame 1 m2[FITC Hardware, Baricho road]

    5500

         
             
    Steel casement window frame 1m2

    5000

         
             
    Louvre window system 2 LM[FITC Hardware, Baricho road]

    900

         
             
    GLASS per  1M2[Kikuyu Glass mart,Waithaka]        
             
    3mm clear

    500

         
    4mm clear

    700

         
    Obscure

    700

         
             
    DOORS        
             
    TnG batten door

    1900

         
    Flush Door

    2600

         
    MDF board

    2750

         
             
             
    PLUMBING[Kerai Hardware, Parklands]        
             
    STAINLESS STEEL – KITCHEN SINK        
    One drain/ one bowl

    1700

         
    Two drain/ one bowl

    4700

         
             
    SANITARY AND ACCESSORIES        
    Ceramic WC Pan + cistern + seat + flush pipe – India

    7500

         
    WC – Asian – & High Level PLASTIC cistern + flush pipe – India

    3500

         
    Shower Cocks – ½” concealed with shower pipe and 3″ rose – UK

    6500

         
    Push Taps – PILLER type – UK

    2560

         
    Wall Type Tap – UK

    1200

         
     

         
    ELECTRICAL[Kerai Hardware, Parklands]

         
             
    FLUORESCENT

    PRICE @ Kshs

         
    POLAROID TUBES – GERMANY      
    2ft Tubes each

    75

         
    4ft Tubes each

    85

         
    ENERGY SAVINGS LAMPS

    PRICE @ Kshs

         
    POLAROID – GERMANY      
    ENERGY SAVING BULBS 2U E27 & B22 11W OR 14W

    151

         
    ENERGY SAVING BULBS 3U E27 & B22 11W OR 14W

    170

         
    ENERGY SAVING BULBS SPIRAL B22 11W OR 14W

    218

         
     

         
    ELECTRICAL ACCESSORIES

    @Ksh

         
    BLANK PLATE SINGLE (C&J)

    46

         
    BLANK PLATE TWIN (C&J)

    59

         
    PATRESS BOX SINGLE (C&J)

    43

         
    PATRESS BOX TWIN (C&J)

    66

         
    CEILING ROSE COMPLETE (BJ & TJ)

    146

         
    ANGLE BUTTEN HOLDER (BG & TJ)

    72

         
    STRIGHT BUTTON HOLDER (BG & TJ)

    85

         
    TOP PLUG 13AMPS (MK)

    108

         
    TOP PLUG 13AMPS NEON (BJ)

    95

         
    INSTANT SHOWER

    1700

         
    DING DONG BELL

    550

         
             
             
             

     

  • A4ARCHITECT.COM CONSTRUCTION MATERIAL PRICE INDEX

    A4ARCHITECT.COM CONSTRUCTION MATERIAL PRICE INDEX

    This construction material price index has been compiled by www.a4architect.com through direct data collection from suppliers in the Building Industry/Hardware shops around Nairobi and Kigali cities.

     

    This is the first ever construction material price index that gives an analysis of construction materials as sold by different small-scale hardware shops in Kenya. This reflects the actual construction materials pricing that Kenyans are paying for.

    With the drastic rise of the USD vs KES, we will be updating the index on a monthly basis so as to keep Kenyans informed on the rise in materials prices hence better construction decisions.

    This incremental change will be reflected in our next index since most suppliers are currently still selling stock that was imported or produced when the KES to the USD was stable.

    This index will also compare the prices of construction materials between Kenya and other select East African countries such as Rwanda .

    SEPTEMBER 2011 PRICES KES
     CONSTRUCTION INPUT KENYA PRICE  [Nairobi] RWANDA PRICE[Kigali]  DIFFERENCE  % INCREASE
    LABOUR
    Foreman

    1100

    1200

    100

    9.090909

    Builder-Fundi

    700

    700

    0

    0

    Builder’s Assistant-Mtu wa Mikono

    350

    350

    0

    0

    Anti Termite 1 ltr [Mlolongo A&B Hardware]

    2200

    Polyethene roll. [Mlolongo A&B Hardware]

    4500

    Masonry stone-rough[Kasarani junction traders]

    40

    Masonry Stone-machine-cut[Kasarani junction traders]

    60

    Walling Brick per m2

    1000

    2000

    1000

    100

    Walling cncrete block per m2

    1300

    3000

    1700

    130.7692

    Cement-50kg bag.

    750

    1500

    750

    100

    SAND per tonne

    1700

    2300

    600

    35.29412

    BALLAST per tonne

    1500

    2300

    800

    53.33333

    Steel Reinforcement bars.
    Y10

    690

    Y12

    970

    1000

    30

    3.092784

    Y16

    1750

    2000

    250

    14.28571

    ROOF
    Timber 6×2 cypress [per LM]

    240

    145

    Hardwood 250mm by 10mm per LM

    1300

    1300

    Clay roof tile per m2[Ruliba Clays,Kigali]

    500

    900

    400

    80

    Concrete Roof tile per m2[Mareba]

    650

    Iron sheet-Gauge 30 per m2[Kiserian Hardware shop next to KCB]

    280

    Gauge 32-per m2

    250

    Stone-coated steel roofing tiles

    2100

    WINDOWS
    Alluminium window frame 1 m2[FITC Hardware, Baricho road]

    5500

    Steel casement window frame 1m2

    5000

    Louvre window system 2 LM[FITC Hardware, Baricho road]

    900

    GLASS per  1M2[Kikuyu Glass mart,Waithaka]
    3mm clear

    500

    4mm clear

    700

    Obscure

    700

    DOORS
    TnG batten door

    1900

    Flush Door

    2600

    MDF board

    2750

    PLUMBING[Kerai Hardware, Parklands]
    STAINLESS STEEL – KITCHEN SINK
    One drain/ one bowl

    1700

    Two drain/ one bowl

    4700

    SANITARY AND ACCESSORIES
    Ceramic WC Pan + cistern + seat + flush pipe – India

    7500

    WC – Asian – & High Level PLASTIC cistern + flush pipe – India

    3500

    Shower Cocks – ½” concealed with shower pipe and 3″ rose – UK

    6500

    Push Taps – PILLER type – UK

    2560

    Wall Type Tap – UK

    1200

    ELECTRICAL[Kerai Hardware, Parklands]
    FLUORESCENT

    PRICE @ Kshs

    POLAROID TUBES – GERMANY
    2ft Tubes each

    75

    4ft Tubes each

    85

    ENERGY SAVINGS LAMPS

    PRICE @ Kshs

    POLAROID – GERMANY
    ENERGY SAVING BULBS 2U E27 & B22 11W OR 14W

    151

    ENERGY SAVING BULBS 3U E27 & B22 11W OR 14W

    170

    ENERGY SAVING BULBS SPIRAL B22 11W OR 14W

    218

    ELECTRICAL ACCESSORIES

    @Ksh

    BLANK PLATE SINGLE (C&J)

    46

    BLANK PLATE TWIN (C&J)

    59

    PATRESS BOX SINGLE (C&J)

    43

    PATRESS BOX TWIN (C&J)

    66

    CEILING ROSE COMPLETE (BJ & TJ)

    146

    ANGLE BUTTEN HOLDER (BG & TJ)

    72

    STRIGHT BUTTON HOLDER (BG & TJ)

    85

    TOP PLUG 13AMPS (MK)

    108

    TOP PLUG 13AMPS NEON (BJ)

    95

    INSTANT SHOWER

    1700

    DING DONG BELL

    550

     

  • THE GROWING HOUSE CONCEPT IN EAST AFRICA: DIAMOND HOUSE BY A4ARCHITECT.COM. FROM VERSION 1.0 IN 2003 TO VERSION 2.2 IN OCTOBER 2011.

    THE GROWING HOUSE CONCEPT IN EAST AFRICA: DIAMOND HOUSE BY A4ARCHITECT.COM. FROM VERSION 1.0 IN 2003 TO VERSION 2.2 IN OCTOBER 2011.

    The first Growing House that was designed to start with 1 bedroomed, then over time move to 2 bedroomed and finally rest at 3 bedroomed was designed by www.a4architect.com.This is the Diamond House . The information was released to the public on 18th February 2010
    http://www.a4architect.com/2010/02/18/haiti-free-house-plans-as-the-dust-settles/
    A4architect.com released this information so as to assist the Haiti People after they suffered a devastating earthquake measuring 7.0 on the Richter scale. This happened on 12th January 2010 and left over 316,000 people dead. This was part of our Corporate Social Responsibility and the designs were uploaded for free on
    http://www.a4architect.com/2010/02/18/haiti-free-house-plans-as-the-dust-settles/
    Since then, www.a4architect.com has continued to improve the design through Research and Development processes.

    DIAMOND HOUSE VERSION 1.0

    JANUARY 2003

    From ORIGINAL DIAMOND HOUSE

    This was designed by www.a4architect.com and constructed in the outskirts of Gaborone city in Botswana in 2003. The materials used for walling was fired clay bricks and was based on a white/Black color scheme which is the main theme for the current version of the Diamond House. This was based on a flat roof design.


    DIAMOND HOUSE VERSION 1.1

    18th FEBRUARY 2010
    http://www.a4architect.com/2010/02/18/haiti-free-house-plans-as-the-dust-settles/

    From Structural Insulated Panel[SIP] House-Office/Residence

    This was first released on 18th February 2010 and was mainly designed on a prefabricated panelized house template. The Room sizes were designed to fit prefabricated Structural Insulated Panel sizes of a width of 1.2m. The dimensions were all based on the 1.2 m wide panel and was designed for the Haiti –South America Market.

    From Structural Insulated Panel[SIP] House-Office/Residence

    The house was designed to be increased from 1 bed roomed to 2 and finally to 3 bed roomed.

    DIAMOND HOUSE VERSION 1.2

    From A4ARCHITECT DIAMOND HOUSE version 1.2

    On April 2010, www.a4architect.com came up with containerized house designs
    http://www.a4architect.com/2010/04/14/plug-n-play-house-2-bedroomed/
    The ever –increasing Dollar exchange rate coupled with global increase in steel prices pushed the costs of constructing the Plug n Play house upwards hence a better solution was needed.

    SEPTEMBER 2010

    www.a4architect.com published their Research on how to reduce costs of constructing a foundation by over 50% and still maintain same or higher quality Part 1.
    http://www.a4architect.com/2010/09/14/how-to-reduce-construction-cost-by-over-50-and-still-maintain-high-quality-part-1foundations/

    JANUARY 2011

    www.a4architect.com published their Research on how to reduce construction cost and still maintain high quality part 2.
    http://www.a4architect.com/2011/01/27/how-to-reduce-construction-cost-by-over-200-part-2-superstructurewalling-doors-windows-roof/
    On JANUARY 27, 2011, www.a4architect.com published their research on simplifying home ownership through 5 simple steps:
    http://www.a4architect.com/2011/01/27/5-steps-to-constructing-your-dream-house-the-haiti-house-plan-2-bedroomed-construction-cost-kes-297000/

    http://www.a4architect.com/2011/02/16/how-to-own-your-house-in-kenya-3-easy-steps/?utm_source=feedburner&utm_medium=feed&utm_campaign=Feed%3A+A4architect+%28A4ARCHITECT.COM%29&utm_content=FeedBurner

    FEBRUARY 2011

    DIAMOND HOUSE 1.2

    www.a4architect.com released the Diamond House version 1.2 and published it through Youtube .

    From A4ARCHITECT DIAMOND HOUSE version 1.2

    MARCH 2011
    After successfully completing various construction projects in Kenya, www.a4architect.com came up with a solution to reduce construction costs associated with Septic Tanks after realizing many Kenyans were wasting a lot of money in building oversize septic tanks without realizing that they are only used as curing devices as opposed to storage devices.

    http://www.a4architect.com/2011/03/16/septic-tank-kenya/

    MARCH 2011
    www.a4arhitect.com released another research on how to reduce the cost of house ownership in Kenya.
    http://www.a4architect.com/2011/03/02/how-to-reduce-cost-of-aqcuiring-new-home-in-kenya/?utm_source=feedburner&utm_medium=feed&utm_campaign=Feed%3A+A4architect+%28A4ARCHITECT.COM%29&utm_content=FeedBurner

    DIAMOND HOUSE VERSION 1.3

    In March 2011, a4architect.com released Diamond House version 1.3

    From 3 bedroomed diamond

    This version fixed a few issues that were noticed within the previous version 1.2.

    JULY 2011

    www.a4architect.com published further research on how to reduce construction cost in Kenya.
    http://www.a4architect.com/2011/07/26/tips-to-reduce-cost-of-constructing-buildings-in-kenya/?utm_source=feedburner&utm_medium=feed&utm_campaign=Feed%3A+A4architect+%28A4ARCHITECT.COM%29&utm_content=FeedBurner


    DIAMOND HOUSE VERSION 1.4

    From DIAMOND HOUSE FRONT TYPE

    www.a4architect .com released Diamond House version 1.4 which offered a wider variety of choices to potential house owners in terms of house shape.

    From DIAMOND HOUSE FRONT TYPE

    The roof colour,texture and materials could now offer a wider choice of preferences.

    From DIAMOND HOUSE FRONT TYPE
    From DIAMOND HOUSE FRONT TYPE

    AUGUST 2011

    DIAMOND HOUSE VERSION 2.0

    www.a4architect.com released and published research on the most efficient house in Kenya-the Diamond House plan version 2.0. This was a culmination of research spanning all the way from 2003 to 2011-9 years.
    Diamond House version 2.0 was inspired by the a4architect.com Ongata Rongai House.

    From 3 Bedroomed House, Ongata Rongai
    From 3 Bedroomed House, Ongata Rongai
    From 3 Bedroomed House, Ongata Rongai
    From 3 Bedroomed House, Ongata Rongai


    DIAMOND HOUSE VERSION 2.0

    From DIAMOND HOUSE FLAT ROOF

    Diamond House version 2.0 could now be easily integrated into other completely different floor plans and house shapes.
    DIAMOND HOUSE VERSION 2.1

    From RONGAI TUALA DIAMOND HOUSE

    More flexibility in terms of floor plans and exterior designs could now be achieved.

    DIAMOND HOUSE VERSION 2.1

    From RONGAI TUALA DIAMOND HOUSE
    From RONGAI TUALA DIAMOND HOUSE
    From RONGAI TUALA DIAMOND HOUSE


    http://www.a4architect.com/2011/08/08/the-cheapest-house-in-kenya-haiti-house-plan/?utm_source=feedburner&utm_medium=feed&utm_campaign=Feed%3A+A4architect+%28A4ARCHITECT.COM%29&utm_content=FeedBurner

    AUGUST 2011
    www.a4architect.com published 10 advantages that potential House owners, Banks and Financial institutions can benefit if they worked with us by utilizing the Diamond House concept.
    http://www.a4architect.com/2011/08/16/10-advantages-of-using-haiti-house-plan-by-www-a4architect-com/?utm_source=feedburner&utm_medium=feed&utm_campaign=Feed%3A+A4architect+%28A4ARCHITECT.COM%29&utm_content=FeedBurner

    29TH AUGUST 2011
    www.a4architect.com compiled the Diamond House into a product and came up with a method of implementation that the Banks and Financial Institutions can use to dispense the Diamond House plan.
    http://www.a4architect.com/2011/08/16/10-advantages-of-using-haiti-house-plan-by-www-a4architect-com/?utm_source=feedburner&utm_medium=feed&utm_campaign=Feed%3A+A4architect+%28A4ARCHITECT.COM%29&utm_content=FeedBurner

    31st AUGUST 2011
    www.a4architect.com published their research into how the Diamond House architecture can mark a Paradigm shift in East African architecture.
    http://www.a4architect.com/2011/08/31/the-diamond-house-design-a-paradigm-shift-in-east-african-architecture/?utm_source=feedburner&utm_medium=feed&utm_campaign=Feed%3A+A4architect+%28A4ARCHITECT.COM%29&utm_content=FeedBurner

    19th SEPTEMBER 2011
    www.a4architect.com published their research on how the Diamond House concept can be utilized to enable East Africans/Kenyans, majority of whom rent houses, to own their homes at an affordable cost-KES8,900 per month.
    http://www.a4architect.com/2011/08/31/the-diamond-house-design-a-paradigm-shift-in-east-african-architecture/?utm_source=feedburner&utm_medium=feed&utm_campaign=Feed%3A+A4architect+%28A4ARCHITECT.COM%29&utm_content=FeedBurner

    17th SEPTEMBER 2011

    www.a4architect.com published a video on YouTube showing how the Diamond House conserves the environment by saving on the number of timber used for roof trusses and eventually the number of trees cut.

    23RD SEPTEMBER 2011
    www.a4architect.com published their research on how the internet can be used to enable Kenyans/East Africans access the Diamond House through Banks/Financial Institutions.
    http://www.a4architect.com/2011/09/23/online-architectural-consultancy-service/?utm_source=feedburner&utm_medium=feed&utm_campaign=Feed%3A+A4architect+%28A4ARCHITECT.COM%29&utm_content=FeedBurner

    4th OCTOBR 2011
    On 4th October 2011, Family Bank released the GROWING HOME concept.

    10th OCTOBER 2011.

    Family Bank and www.a4architect.com agree to work together with the Diamond House included in the Family Bank’s Growing Home product.

    11TH OCTOBER 2011.

    Currently, a4architect.com is working on DIAMOND HOUSE VERSION 2.2 to be released by the end of October 2011.

    The Version 2.2 offers a wider choice of floor plan layout, utilizing the American style Kitchen within the confines of the shape of Version 2.0.

    OTHER FINANCIAL INSTITUTIONS WHO HAVE COME UP WITH SIMILAR CONCEPTS.

    Since the publishing of the Growing house phased construction by www.a4architect.com in 18th FEBRUARY 2010,
    http://www.a4architect.com/2010/02/18/haiti-free-house-plans-as-the-dust-settles/

    1. JULY 2010. Housing Finance Bank of Uganda.

    The Housing Finance Bank of Uganda first published their Growing House on 29th JULY 2010.
    http://housingfinance.ug/index.php?option=com_content&view=article&id=57

    Their Growing House concept does not in any way involve architectural design and does not utilize customized house plans.

    2. OCTOBER 2011.National Housing Corporation of Kenya. -STILL IN DEVELOPMENT AND NOT AVALIABLE FOR SALE as of 11th OCTOBER 2011.

    http://www.nhckenya.co.ke/index.php?option=com_content&view=article&catid=22&id=100&Itemid=29

    The NHC has also used a similar concept on their Kericho project which is still in its infancy stage and not developed. Currently [11th October 2011], the NHC is still developing the concept and their houses are still not on sale to the public until further notice once they are through with it.

    3. FAMILY BANK-OCTOBER 4TH 2011.

    http://www.familybank.co.ke/Info/Family%20Bank%20Introduces%20the%20Growing%20Home%20Mortgage

    The Family Bank growing home concept was released on 4th October 2011. The www.a4architect.com Diamond House will be among the designs that Family Bank customers can choose for them to take advantage of the 9 years of research and Development into efficient housing which includes a very wide choice of house designs that their customers can choose from.
    This research is continually being updated for the betterment of the Kenyan/East African Housing as a whole.

    CONCLUSION.

    www.a4architect.com will keep researching and developing new innovative Housing Solutions which are intended to offer Kenyans/East African and other people in the world solutions that will make their housing more efficient and in effect, avoid wastage of their hard-earned resources and keep costs low.

    We at www.a4architect.com are open to partner with willing Banks and Financial Institutions that would like to tap into our 9 year long research.

    Architect Francis Gichuhi Kamau