QUOTATION FOR MAIN ROAD AND PARKING AREAS.
Items No Items Description Unit Qty Rate Amount
ASPHALTIC CONCRETE WORKS(AC)
1 Prepare surface of carriageway including leveling in preparation to receive wearing course cart away the excavated material. M3 1,680 100 168,000.00
2 Provide k160 colas as binder course ltrs 33,600 120 4,032,000.00
3 Provide, place and compact asphaltic concrete type 1 as wearing course M3 1,344 27,000 36,288,000.00
Total 40,488,000.00
PAVING BLOCKS INSTALLATION (CABRO)
1 Prepare surface of carriageway including excavation of existing bituminous material and cart away to spoil. M3 33,600 350 11,760,000.00
2 Provide 100mm by 125mm kerbs (channels) in support to carriageway M 11,200 800 8,960,000.00
3 Provide, place and compact 60mm paving blocks as wearing course including 40mm dust bedding and sand for compaction. M2 33,600 1,200 40,320,000
TOTAL 61,040,000.00