Month: January 2014

  • Standard Gauge rail in Spain and Australia. Technical details on Dual rail option for aKenya.

    Other countries that have had to upgrade their railway lines have come up with detailed research into the options available.

    See research done in Spain

    http://www.vialibre-ffe.com/pdf/Track_gauge_changeover.pdf

    Australia dual gauge railway.

    Switzerland rail

    Wallangarra, Australia

    Western Australia


    The trans-continental passenger train Indian Pacific, which has run between Sydney and Perth since 1970, is seen on the dual gauge track (3’6″ and 4’8.5″ – 1067 mm and 1435 mm) between Kalgoorlie and Perth (655 km) in 1976, with the loco in the scheme of the then Westrail.

  • Stabilised Soil Block House designs in Kenya.

    Stabilised Soil Block House designs in Kenya.

    They require larger roof overhangs to protect the walls from rain water. They require to be slightly raised from the ground to protect the wall from ground water and moistrure. The roof design needs to be in such a way that it prevents Bernoulli effect to lift the roof upwards during strong winds.

    Advantages.

    Where quarry stones are not available, they are a good substitute eg Northern Kenya.

    Disdavantages.

    They need close supervision to ensure structural strength high quality.

    In areas where quarry stone is available, where stone costs around kes 60 per piece, then the soil blocks will not have any advantage because it also costs nearly the same as stone to produce.

    Soil blocks are advantageous in areas where quarry stone costs around kes 100 and above per piece .

    Storeyed house construction.

    Quarry stone has an advantage since it can be used to support a storeyed house without using concrete columns.

    Soil blocks are only used as an infill material that does not carry any weight so in storeyed houses, the load bearing structure has to be built using concrete columns, beams and slabs.

    Francis Gichuhi Kamau, Architect.
    info@a4architect.com

  • Reasons for Building collapse in Kenya.

    Reasons for Building collapse in Kenya.

    Reasons are whereby the developer does not ensure that the design team comprising architect, quantity surveyor, structural engineer and services engineer are involved in the supervision of the actual construction.

    All the buildings that have collapsed in Kenya did not have architects and engineers involved in the supervision of the actual construction.

     

    Other reasons could be that the Government, through the County Government planning departments that approve buildings, do not enforce the developers to have architects and engineers in the supervision of the building. The enforcement by the Planning department is mainly in the design part whereby the drawings need to be stamped and signed by the architects and engineers. This should also go a further step and ensure enforcement of involvement of architects and engineers during the actual construction.

    Government institutions involved in buildings safety.

    Ministry of Lands and Housing.
    This Ministry licenses and regulates the Architects, Quantity Surveyors and Structural Engineers. This ministry also registers building contractors.

    County Government Planning departments. These departments approve building construction works.

    Research.

    I have personally documented some buildings that have recently collapsed in Nairobi to find out why they collapse and what can be done to prevent this.
    See the documentation here

    http://www.a4architect.com/2011/09/18/why-buildings-collapse-in-kenya/

    http://www.a4architect.com/2011/06/20/why-the-langata-southern-bypass-building-collapsed/

    http://a4architect.wordpress.com/2012/06/14/why-the-mlolongo-building-collapsed/

    http://www.a4architect.com/2012/02/06/why-the-mwikikasarani-building-collapsed-and-how-to-prevent-this/

    Advice to potential tenants.

    Potential tenants can counter check if the building design was done by registered engineers at the County Government planning department. This information is usually kept public at the planning departments.

    Potential tenants can get the contacts of the engineers and architects and confirm from them if they participated in the day to day supervision of the building.

    An assurance from the architects and engineers involved in the design is good enough for a potential tenant to feel safe.

     

     

    Kenya Government can borrow from Australia and New Zealand , who are very strict on enforcement of building safety due to the numerous earthquakes in their locale.

    Today there was an Earthquake in New Zealand whereby there were no casualties even though the earthquake was very strong, 6.3 on the Richter scale.

    The most notable damage was a new sculpture erected to publicize the movie Hobbit, fell at a restaurant where luckily, no one got injured.

    http://www.nzherald.co.nz/nz/news/article.cfm?c_id=1&objectid=11189343

    Kenya’s strongest earthquake hit the Subukia/Nakuru area over 70 years ago. This means that there can be a possibility of a severe earthquake within this region. Therefore, buildings safety should not be taken lightly by the County Government responsible with ensuring the safety of Kenyans.

     

    Francis Gichuhi Kamau, Architect.

    info@a4architect.com

  • Door access open/close using mobile Phone for Hotels

    Technological advancement in access control of buildings especially the hotel industry have enabled the use of mobile phones to open and close doors.

    Once a guest checks in at the hotel reception , he is given a toll free number to call when near his hotel room.

    Once he calls the number close to the hotel room door, the door lock is designed to respond to the sound emmited from the mobile phone and opens to grant the phone owner access into the room.

    https://www.youtube.com/watch?v=4yXd3wS3Acg

    The hotel IT department will be able to keep changing the sounds used to open the door locks as the guests keep changing.

    To prevent chances of burglers recording the phone sound then gaining unlawful entry, the phone sounds keep changing severally after a few minutes after being used to open the door. The sound is also securely encrypted.

    This technology will also be explored upon for use at the proposed a4architect hotel along the Southern Bypass, Nairobi.

    http://www.a4architect.com/discus/topic/joint-investment/page/4/

    Francis Gichuhi Kamau, Architect.

  • a4architect.com

    https://www.facebook.com/a4architectkenya

  • Log in, Register on a4architect.com using Twitter, Yahoo, Gmail and LinkedIn

    a4architect log in

    Simply log in to your twitter, gmail, yahoo or LinekdIn account then click on the respective button on the a4architect.com website to log in.

  • House styles in Kenya

    African/Swahili

    Eg. Allan Donovans house at Kitengela

    Swahili Beach hotel at Diani, Mombasa.

    African architecture

    example. Hon. Mutula Kilonzo house

    Tiwi Beach hotel, Mombasa

    British/European rustic designs.

    Example. Karen Blixen house.

    Kihingo village

    Windsor park

    Modern designs.

    1 (6)

    1 (10)

    2 (1)

    2.15649_ESPLUGUES-CIUTAT_DIAGONAL_2

    32A186B9-263D-44DD-8DFE-49CFBA533B97

    042E0520-9CD7-403D-8902-3B2ED8373721

    69ADBA0B-3C69-4678-AB13-663626290349

    1530_10151474519318359_1021396162_n

    5838_548203188570181_1674817779_n

    6960_542733219117178_1291385822_n

    267658_535409066516260_1712800745_n

    942238_10151477344181234_1276651771_n

    969958_10151511968773043_756829832_n

    970380_536251983098635_1006673751_n

    970486_623197764359106_697464692_n

    988603_546993408691159_1451112024_n

    988691_582375968486236_1652992288_n

    996187_512099212177639_70516319_n

    1002726_550749394982227_948308787_n

    1003644_10151642259694361_645536220_n

    1011000_560046277385872_911922566_n

    1012611_403841333066451_597038480_n

    1013094_554233704633796_2055595291_n

    1044596_553609101362923_1503831802_n

    1237807_596541900402976_1486452902_n

    architecture-Casa-del-Viento

    Capture

    Chenequa-Residence-Architecture-by-Robert-Harvey-Oshatz-Architect-570x356

    D8792296-F03A-4E13-9BFD-CF2932871AB1

    DDC19288-E2B2-4B14-B1F5-B5340F4FFD4A

    design-Wissioming-Residence-785x1024

    ed7db2a081a5d247c00b9eeccc5acd63

    f87a935f-a6e0-4da3-94f3-c32697871aef

    Facade

    FW_FALL_01

    Green-Modern-Public-Library-Concept-design-architecture-670x250

    house

    images

    La-Grande-Vue-1

    shell-house-japan-2

    SL-Residence-4

    SL-Residence-8

    SL-Residence-13

    Three-story-curved-house-by-Aamer-Architects-i10-540x551

    tri_2_hero-from-northeast

    Villa-Valentina-01

    xmeera-house-by-guz-architects.jpeg.pagespeed.ic.fBi4I7UyV9

    Francis Gichuhi Kamau, Architect.
    info@a4architect.com

  • A4ARCHITECT MOTEL AT THOGOTO SOUTHERN BYPASS JUNCTION BUSINESS PLAN

    A4ARCHITECT MOTEL AT THOGOTO SOUTHERN BYPASS JUNCTION BUSINESS PLAN

    Project: Motel along Southern Bypass at Thogoto junction.

    Client: A4ARCHITECT REAL ESTATE INVESTMENTS FORUM

    Location: Thogoto town, along Southern Bypass.

    Number of Motel rooms. 30

    Sale price per Motel room. KES 1,193,916.67

    Return on Investment. 5.5 years.

    Monthly income expected per share.KES 18,000

    JANUARY 11TH 2014

    EXECUTIVE SUMMARY
    This is a project proposal for the construction of a middle class Motel comprising of 30 No. rooms on a parcel of land situated at Thogoto.
    The project has been conceived, designed and will be implemented by www.a4architect.com for Ms a4architect investments ltd.

    The estimated development cost for the project is KES 35,817,500.00

    The project completion period shall take 12 months from ground breaking to hand over.
    Sales for 30 Units @ KES 1,193,916.67 will be in the range of KES 35,817,500.00

    Return on Investment shall be in the range of 5.5 years .with Property value appreciation is estimated to be at 50% per annum, meaning the value doubles after every 2 years, due to proximity to the busy Southern Bypass highway , Karen and Thogoto town.

    WWW.A4ARCHITECT.COM
    A4architect is a dynamic property consulting company specializing in providing a one-stop service for the management and development of a variety of property development projects. It provides its clients, who may be property owners, developers or tenants, with the expertise to guide a project through the complex development process from concept through to building completion.
    Depending on the requirements of their client, A4architect can provide a full or partial consulting service. The company’s involvement can vary from sourcing suitable sites, arranging local authority approvals, managing the professional team or providing a complete project management service.
    The principals behind the firm have several years experience in designing and managing to completion several projects of various natures .

    THE PROJECT
    The project comprises the construction of 30 No. Motel rooms each self contained, and a restaurant for Sale at Thogoto Southern Bypass junction on a subdivision measuring just about 0.17 acres.

    The overall theme of the development would be one of maximizing on the plot use whilst maintaining reasonable individual privacy within a ‘Green Sustainability’ architecture.

    PHASED CONSTRUCTION

    In order to ease the impact of the overall cost of the development it is proposed to carry out the construction in phases to be jointly agreed on with the clients.
    The 0.17acre plot will have 60 units in total.
    The construction will be phased in 4 phases comprising of 15 No. units respectively.

    Each of the phases shall be planned to deliver units that are complete and ready for occupation. This will facilitate pre-selling of some of the units prior to the end of construction. This would be achieved through pro-active networking with property managers and use of the internet and social media in particular.
    The foregoing will result in further cushioning of the effect of the high cost of financing in Kenya.
    In order to enable planning of major infrastructural requirements such as water storage and foul water disposal right from the outset, a master plan of the entire development shall be evolved. Thus the capacity of some of the facilities may initially exceed the needs of the accommodation provided, but this would be done with the full knowledge that the development will grow to fully utilize the facilities provided.

    Auxiliary features include:

    • Paved walkways .
    • 10 car parkings.
    • Extra rain-water storage .
    • Planted landscaped 24-hr. irrigated gardens.
    • Solar power electrical wiring

    The country ambience would further be enhanced by having strategically planted palm trees which would serve the added role of acting as wind breaks.

    DEVELOPMENT BUDGET
    The development budget is as follows:

    30 No. motel rooms each measuring 5m by 3.6m.

    • The development budget includes professional fees

    1.00 Building details
    1.10 Type of rooms: 5m by 3.6m self contained room.
    1.11 Number of rooms :30
    1.12 Number of rooms in each floor :15
    1.13 Restaurant
    1.14 Office
    1.15 Building Cost including External Works and Land: KES 35,817,500.00

    2.00 Construction cost breakdown

    Total Building works[including Infrastructure& Electric Fencing]-
    KES 31,317,500.00

    3.Land Cost- [0.17 acres] KES 4,500,000.00

    OVERALL PROJECT COST INCLUDING LAND= 35,817,500.00

    SALES PROJECTIONS

    1.11 Projected sale price per hotel room unit 1,193,916.67

    1.12 Overall sales revenue=35,817,500.00

    1.14 Gross Return on Investment at Worst case Scenario. 5.5 years

    LOCATION

    Thogoto Southern Bypass junction is situated 15 minutes drive[25 km] from Nairobi’s Central Business District along Southern Bypass. The site is served by the Southern Bypass, which is an International road linking Mombasa to Rwanda and Uganda. The site of the proposed construction is fronting the Southern Bypass near the cross roads at Thogoto town. See google map below

    http://goo.gl/maps/slpIR

    The area is connected to the mains water supply from the Kiambu Municipal Council and also has easily connected electricity supply from KPLC.

    The immediate locality consists of subdivisions each measuring an eighth of an acre. Developments in this area are predominantly single family residences. The occupancy is predominantly homeowners. With the new construction of the bypass, developments around this area are rapidly transforming into high rise commercial nature.
    The majority of the buildings here are of reasonably well constructed and maintained.

    MARKET DESCRIPTION

    Given the proximity of the site to Nairobi’s CBD, Southern Bypass , Thogoto town, Kikuyu town, Karen, Dagoretti market, the site would realize good returns on a multi level hotel development.

    Property appreciation is expected to be in the range of 50%, with value doubling every 2 years.

    The planned development intends to maximize this potential by creating accommodation that is spacious whilst at the same time making optimum use of the vertical space available.
    At the moment, the closest hotels nearby are located at Kikuyu town,5 km away.

    Wida highway motel, located 8km away at Sigona, charges kes 7,000 per night.

    We have worked out a 5.5 year Return on Investment based on 60% occupancy at charges of kes 1,000 per night.
    This means that the project has potential to increase charges per night from kes 1,000 to kes 7,000, thereby giving Return on Investment within 7 months.

    The planned development would meet an existing need since the site is located along the soon to be completed busy highway from Mombasa, Tanzania, Zambia and Southern Africa to Uganda, Rwanda and Central Africa.

    COMPETITION
    In the locality of the planned development, there exist several properties which are either owned by the residents or are rental properties. The closest competition perhaps comes from the Tamarind Estates which are currently selling at KES 7.5 million per unit. These are however not competitive in terms of pricing since they are priced KES 3.5 Million higher than the Greenville Units.

    The other competition is the Great Wall apartments at Mlolongo selling at KES 3.0m which fortunately is 100% sold out and the 360 Apartments[a few meters away] selling at KES 3.5m.

    SALES PROJECTIONS
    It is planned that marketing the development for sale shall commence before the construction begins.
    Consequently it is anticipated that by the time the first floor is completed there shall be an inflow of funds that can either be utilized to start construction of the next phase/second floor.
    The sale price for each unit has been set at KES 1,193,916.67 .

    This sale price enables potential investors to reap into the high property appreciation rates seen around Nairobi, with potential for doubling the worth every 2 years.

    This sale price also enables potential investors to reap into the high Retrun on Investment, set at worst case scenario of 5.5 years with charges of kes 1,000 per night and best case scenario of 7 months with charges at kes 7,000 per night, both at 60% occupancy rate per year.
    If the occupancy rate increases, returns will also increase pro rata.

    Currently, options available for investors in Kenya with KES 1,193,916.67 are limited to buying land, 1/8th acre , in areas far from Nairobi CBD such as Kajiado, Isinya, Kamulu whereby the lands will not offer monthly sources of income and can only be resold after many years for them to offer considerable returns to the investors.
    With the proposed investment in a Motel along Southern Bypass, the KES 1,193,916.67 gives you monthly income and doubles its value every 2 years hence a better investment.

    Exit Plan.

    In the event the Motel room model does not work out as initially planned, the rooms can be converted into monthly rentable single rooms and the restaurant rented out at market rates.

    EXECUTION OF THE PROJECT
    A4architect will in this provide the clients with a full design/build service. This shall include

    1. Design and specification
    Architectural, structural, mechanical and electrical drawings shall be prepared and necessary approvals sought.
    During the various stages of the design, the client shall be kept fully informed and client approval sought prior to proceeding to the next stage. The engineering design shall be done by registered engineers under the guidance of A4architect. Detailed specifications shall be developed with close consultation with the client.

    2. Project estimates
    Subsequent to completion of the design, a Quantity Surveying firm under the guidance of A4architect shall undertake construction cost estimates for the project.

    3. Preparation of tender and contract documents
    After final design has been done and client approval obtained, tender documents shall be drawn up for the general and specialist contractors. The specialist contract documents shall be prepared with guidance from the relevant engineers.

    4. Tendering
    Selected contractors shall be invited to tender for the various work packages. We shall then analyze the tenders returned and forward our recommendation to the client.

    5. Contract documentation
    With the contractors have been selected, we shall draw up the required contract documents and enter into contract with the contractors on the client’s behalf.

    6. Project management
    Subsequent to the contracts being signed and mobilization to the site, we shall provide superintendence and project management. This will entail ensuring that the project is brought in on time and under budget by constant monitoring of operations on site and remedying any issues that may prevent timely completion or cause expenditure to exceed the budget.

    7. Contract administration
    We shall handle all matters relating to the various contracts including but not limited to stage payments, performance bonds, extensions of time and relationships between the various trades involved in the project’s execution.

    8. Sales and marketing
    In conjunction with an estate agency approved by the client, we have produced a presentation package to be used in the marketing of the Motel.

    PROJECT TIMELINES
    a) Design to Tender
    The design to tender process will take a total of 1 month. This will include commissioning of all engineering design, preparation of bills of quantities and obtaining of all relevant approvals for the development.
    b) Construction
    Construction of the entire project is estimated to take a maximum of 12 months.

    MARKETING AND SALES
    Marketing of the properties has been planned to start even before ground is broken for the start of the construction. This serves the dual purpose of creating awareness of the availability of quality property for sale and to confirm the validity of the market intelligence.

    Already several inquiries have been received from potential buyers .

    The internet, mainly Google ads, will be the main marketing tool.
    Real estate agencies will be supplied with a virtual presentation kit that includes a walk through movie of the development. A prospectus of the development will also be made for distribution to potential purchasers.

    Prepared By
    Francis Gichuhi Kamau B.Arch. U.o.N M.A.A.K[A] Registered Architect