Month: June 2013

  • How Architectural services help to improve Real Estate earnings.

    How Architectural services help to improve Real Estate earnings.

    Architectural service is in two main parts.
    1. Architectural Design.
    2.Construction project Management.

    Architectural design.

    This helps to ensure that the best arrangement of the building in relation to the land boundary is achieved. This helps to ensure more units can be fitted within a piece of land hence more profits to the land owner.

    Also, how the interior spaces relate to each other is addressed within Architectural design. Architects will ensure that the critical spaces e.g. bedrooms, kitchens , living rooms have adequate space which is not eaten by non critical space such as corridors. The balance of circulation corridor spaces vs. livable spaces is achieved in such a manner that the land owner’s investment mainly goes into livable space as opposed to circulation space.

    Design arrangement that psychologically gives the impression of more space is also addressed. Use of natural light and ventilation ,resulting in better quality interior spaces, is also achieved.

    Construction Project Management.

    Architects ensure that the Best Practices the world over on how to go about constructing buildings is achieved. Architects will advice on the roles of the Quantity Surveyor, Structural, Civil, Electrical and Mechanical engineers, landscape architects, interior designers and land planners.

    Of late, there have been cases of buildings collapsing in Kenyan and other countries around the world. This happens when the developer has not taken into consideration other consultants such as the civil and structural engineers into the project. The developer is supposed to ensure that the complete design team comprising of architect, quantity surveyor, and engineer is working in harmony. This way, no such cases can occur.

    Selecting an contractor.

    There are huge savings that the developer can get if he uses the advice of the architects and quantity surveyors in obtaining and procuring the building works. Systems that have been tried and tested internationally for any given project size will come into play. The reason South Africa has one of the lowest construction costs in Africa but the highest construction quality in Africa is because all projects, including simple pit latrines, go through an architect, and engineer and a quantity surveyor. The South Africans don’t use any shortcuts. This has in turn benefited them in that the construction costs are much lower.

    Kenyan construction costs are high because a huge percentage of building developers rarely use architects, engineers and quantity surveyors. The result is usually a poorly constructed building that fetches low rent but still as expensive top construct as the good quality ones.

    A good example is the high rise flats in East Lands. The cost per m2 is same or higher than the better quality ones in Westlands, Kileleshwa tect. The reason these will be of lower quality but higher construction cost is because the developers are not being able to benefit from the thousands of hours that the architects, engineers and quantity surveyors put it.

    Cost of consultancy.

    Full Architectural, Quantity Surveying and Engineering services would cost on average 10% of the total construction cost. This investment by the developer is usually the make or break in terms of rental or sale income. Projects without this input will fail or return poor rents. Projects with this input have higher rent, sales and have a lower construction cost.
    Example.
    The below housing projects are right next to each other. One fetches double the rent of the other. Construction cost per m2 is the same. One has higher quality of construction than the other. The only difference is architectural design, which costs a very small percentage of construction cost but can result in over 100% increase in rental or sale income.

    Lenana View Partments.
    Rent. 60,000 KES.

    Neighbouring Apartments. Rent. 30,000KES.

    The reason one project costs the same as the other, has higher quality of construction and has double the rent of the other is that the developers tapped into the resources of the architects, quantity surveyors and engineers.

    Francis Gichuhi Kamau, Architect.
    0721410684

  • Joint Venture in Kenya. 100% financing for Real Estate Projects. Highest Return on Investment .

    Joint Venture in Kenya. 100% financing for Real Estate Projects. Highest Return on Investment .

    Joint Venture for construction of buildings in Kenya is now a common occurrence . Many buildings are being financed this way. Notable buildings financed this way are the Suraya Housing project along Kiambu road, Everest park at Athi River and Project Snow Drop in Upper Hill.

    Suraya Kiambu road.

    Everest Park, Athi river.

    Snow Drop, Upper Hill.


    Why Joint Venture.

    As the cliché saying goes, in Real Estate investment, there are 3 important points
    1.Location.
    2.Location
    3.Location.

    This means that not all potential Real Estate investors can get prime land. A good example of prime land is land fronting tarmac, land in Nairobi CBD ,Upper Hill, Westlands, Runda, Karen etc.

    Land owners in such prime areas have 2 options to fund their Real Estate projects.

    1.Sell part of the land to enable then raise 20 to 30% of the total project cost needed by the banks for them to release a loan of the remaining 70 to 80% of construction cost.

    2. Look for a Joint Venture partner to raise the 20 to 30% needed by the banks as condition for releasing the 70 to 80% of construction cost.

    In most cases, the Joint Venture scenario presents a win win situation since the development can be constructed with economies of scale and services such as parking can be easily availed in larger plot sized developments.


    Joint Venture Return on Investment.

    As a real estate investor, Joint Venture returns on average between 100% to 300% of the money put into the investment within 2 to 3 years. This is a very impressive return compared to the real estate average of 20 to 30%.

    Example. 0.5 acre in Nairobi CBD outskirts Joint Venture.

    The land owners contribution is kes 120m which is the value of the land.
    The cost of construction is 400m.
    For the land owner to obtain bank financing, he will require to have 20% of 400m in cash=80m.
    This is a huge amount of cash so a JV win win situation is necessary.
    The JV partner is required to inject KES 80m.
    With this, he gets to be part owner of the land.

    A Special Purpose Vehicle company is registered for this purpose whereby the land owner transfers the land into the company jointly owned by him and the JV partner.

    Once the bank releases the loan to construct, houses are completed and sold off. After all expenses are deducted, a profit of kes 200m is realized.

    The land owner gets the value of his land, kes 120m plus a share of the 200m, usually on a 50 50 split. He walks with kes 220m.

    The JV partner after injecting kes 80m walks with the kes 80m plus kes 100m. This represents a 125% return on investment within 2 to 3 years which is quite impressive.

    Conclusion.

    For the land owner, a JV partnership represents the easiest way to unlock funding for development.
    For the JV partner, the JV presents a situation for him to make over 100% return without having the need to buy land in a good location.

    Francis Gichuhi Kamau, Architect.
    0721410684

  • Differences between High, Middle and Low cost houses in Kenya.

    Differences between High, Middle and Low cost houses in Kenya.

    High cost houses have a construction cost of kes 40,000 per m2 and above.
    Middle cost have between kes 25,000 to kes 40,000 and low cost have kes 25,000 and below.

    High cost.

    Example of this is projects such as Kihingo Village in Nairobi.

    Notice the use of external textured surfaces, use of pattered hand dressed stones, external wall cladding with Mazeras, large full glass double doors, uPVC windows, stone coated steel roofing tiles and the large plinth area of approx.400m2.
    These are a few of the elements that result to the high cost of construction.

    Middle cost.

    These are found in areas such as Kitenglea, Rongai, Ruai, Kiambu.
    These are characterized by smaller plinth areas of around 100m2, use of natural stone external walling with basic keying finish, concrete or mabati steel roof, steel casement windows , small to average sized doors and windows without full glass and basic landscaping.

    Low cost.

    These are found in areas such as Kangundo, Joska,and 2km deep from tarmac in towns 30km and above from Nairobi.

    The main characteristics include basic shape without elaborate design, external masonry walling without keying, no paint, use of light gauge steel roofing sheets, no ceilings, no landscaping, very small windows and doors.

    Conclusion.

    Its important to plan your building with the right class for the right neighbourhood. A high class finished house in a low class neighborhood will not give the returns. The cost of construction will be high but the maximum rental or sale value will be disproportionately low.
    Same applies for low class finished building in a high class neighborhood.
    A good example of this is the newly constructed Big Square building in Karen shopping centre. This has been constructed using high class materials. Its already enjoying 100% occupancy rates with rents of over kes 100 per sq.foot.

    Also, the Karen Nakumatt building enjoys 100% tenancy rates with high rent per square foot.

    In between these 2 buildings, is the Tana house building. The rent per square foot is much lower and the occupancy rate is also lower. This is because of the lower quality of materials and workmanship used, and lower architectural design appeal compared to the two buildings sandwiching it.

    Tana House.

    The cost of increase in quality of construction material and workmanship in an area that can derive good rent is usually very low . With good feasibility study planning where a business plan is prepared which will allow banks to understand the project and finance the construction is all what is required. When such a project is not carefully planned, the rental returns will be low for the duration of the building .

    Francis Gichuhi Kamau, Architect.
    0721410684

  • Kenya Construction Industry at 50 years.

    Kenya Construction Industry at 50 years.

    Kenya attained its independence from the British in 1963. Its now 50 years since. Below is an overview on the changes that have taken place within the construction industry.

    Prior to colonization of Kenya by the British in 1895, the architecture in Kenya was traditional. Each community shaped its buildings depending on climatic factors , material availability and space use.

    Areas that had less rains could be able to sustain earthen roofs eg Manyattas. Areas that had heavy rainfall had steep roof pitches eg Kisii. Areas that had high humidity had grass walled huts eg Coast province.

    After 1895, the British introduced their architecture. This architecture was mainly signified by use of hand curved masonry walling, clay roof tiles and wooden windows. Examples of this is the Kipande house building along Kenyatta avenue built in 1913. It was designed by Gurdit Singh.

    Between the early 1900s till 1963.

    Between the early 1900s till 1963, the Kenyan architecture was a minute of traditional indigenous huts for locals and the masonry buildings used by the British colonists.

    All the traditional indigenous huts were at ground floor level execpt at the coast where the arabic architecture influence had houses of several levels such as the Fort Jesus built in 1591 by the Portuguese and Arabs.

    Between 1963 and 1970.

    City Hall building was constructed in 1957.
    Parliament building was also built during the same period.

    Watch the 1950s video below.

    http://www.britishpathe.com/video/new-parliament-building-in-nairobi

    The Kenya Nairobi High court building was also constructed during the 50s.
    Indigenous Africans shifted from the grass thatch and mud hut architecture into British style masonry stone walled , pitched roofed houses.

    the Kenyatta government spearheaded construction of high rise buildings such as KICC building constructed in 1967 by Solel Boneh and Factah contractors. It was designed by Architect David Mutiso and Architect Karl Henrik Nostvik.

    Hilton hotel was also constructed during this period.

    Housing estates such as Jericho and Jerusalem in Eastlands, Nairobi came up.
    Most housing units are still in only 1 level.

    Between 1970 to 1980.

    More high rise buildings were constructed in Nairobi CBD. The NSSF building was constructed in 1974.

    Notable of these is the Nyayo house towers which commenced in 1979.

    BETWEEN 1980 to 1990.

    Notable high rise structures are the City Hall Annex building built in 1981.

    Residential estates such as Buru Buru were competed then. Buru Buru phase 5 was completed in 1982.
    Umoja 1 and 2 estates were also completed during this period.

    BETWEEN 1990 and 2000.

    This period marked a slowdown in the Kenyan construction industry. Very few new buildings and residential estates were constructed. Notable buildings constructed during this period is the I and M building along Kenyatta avenue.

    Residential units shifted into 2 levels in height.

    BETWEEN 2000 and 2010.

    This period was marked by a reduction of bank interest rates. This enabled Kenyans to easily obtain financing for construction. Towns such as Kitengela ,Rongai and Ruai literally grew overnight. Residential estates for sale came up all over the country. New high rise buildings came up around Nairobi CBD. Upper Hill , Westlands , Kilimani and Hurlingham grew overnight with numerous skyscrapers.

    A shift from the previous construction materials characterized by concrete walls was noted. More high rise buildings were now being constructed with larger glass facades.

    AFTER 2010 and beyond.

    New highrise buildings are coming up all over the country. buildings such as Delta in Westlands have completely changed the sky scape.

    Residential units have taken a new dimension into high rise from the previous bungalow and maisonette types.

    Now that we have internet, the influence of new architecture and construction methods from other parts of the world will aid in hastening the movement of design type into more modern looking buildings.

    Am sure that the next 10 years will completely change the way we view Real Estate. New methods of financing buildings, new construction material, higher populations and scarcity of land are some of the factors that will ensure the construction types are completely different from what we see now. Nairobi will look like Dubai or Shanghai.
    Dubai.


    Shanghai.

    Francis Gichuhi Kamau, Architect.
    0721410684

  • Kiambu Road Housing project.

    UNIT TYPE 1.                230M2                     2.4 ACRES.                    20 UNITS
    Cost Item Kshs %
    Land 100,000,000.00 27.70620342
    0.00 0
    Construction 207,000,000.00 57.35184108
    0.00 0
    0.00 0
    Professional fees 10,350,000.00 2.867592054
    Project Management fees 2,070,000.00 0.573518411
    Marketing 4,250,000.00 1.177513645
    Financial Charges 37,260,000.00 10.32333139
    Total 360,930,000.00 100
    Financing Plan Kshs %
    Developer 153,930,000.00 42.64815892
    Debt Finance 207,000,000.00 57.35184108
    Presales 45,000,000.00 12.46779154
    Total 360,930,000.00 112.4677915
    PROFIT
    TOTAL SALES FOR 20 UNITS 450,000,000.00
    TOTAL EXPENDITURE 360,930,000.00
    NET PROFIT 89,070,000.00
    % Profit Margin 24.67791539
    Take home ammount. 189,070,000.00
    UNIT TYPE  2.           190M2                          2.5 ACRES.                    24 UNITS
    Cost Item Kshs %
    Land 100,000,000.00 27.81269817
    0.00 0
    Construction 205,200,000.00 57.07165664
    0.00 0
    0.00 0
    Professional fees 10,260,000.00 2.853582832
    Project Management fees 2,052,000.00 0.570716566
    Marketing 5,100,000.00 1.418447606
    Financial Charges 36,936,000.00 10.27289819
    Total 359,548,000.00 100
    Financing Plan Kshs %
    Developer 154,348,000.00 42.92834336
    Debt Finance 205,200,000.00 57.07165664
    Presales 44,400,000.00 12.34883799
    Total 359,548,000.00 112.348838
    PROFIT
    TOTAL SALES FOR 24 UNITS 444,000,000.00
    TOTAL EXPENDITURE 359,548,000.00
    NET PROFIT 84,452,000.00
    % Profit Margin 23.48837985
    Take home ammount. 184,452,000.00
    UNIT TYPE 3       170M2                                    2.5 ACRES.                    32 UNITS
    Cost Item Kshs %
    Land 100,000,000.00 24.36932195
    Preliminary 0.00 0
    Construction 244,800,000.00 59.65610013
    External Works 0.00 0
    Contingency 0.00 0
    Professional fees 12,240,000.00 2.982805006
    Project Management fees 2,448,000.00 0.596561001
    Marketing 6,800,000.00 1.657113892
    Financial Charges 44,064,000.00 10.73809802
    Total 410,352,000.00 100
    Financing Plan Kshs %
    Developer 165,552,000.00 40.34389987
    Debt Finance 244,800,000.00 59.65610013
    Presales 51,200,000.00 12.47709284
    Total 410,352,000.00 112.4770928
    PROFIT
    TOTAL SALES FOR 32 UNITS 512,000,000.00
    TOTAL EXPENDITURE 410,352,000.00
    NET PROFIT 101,648,000.00
    % Profit Margin 24.77092837
    Take home ammount. 201,648,000.00
    Total no. of units 76
    TOTAL PROFIT 275,170,000.00                                  3,237,294.12
                                                          –
                                                          –
    TOTAL TAKE HOME AMMOUNT 575,170,000.00                                  6,766,705.88
                                                          –
                                                          –
    Total land cost                       300,000,000.00                                  3,529,411.76
                                                          –
    total project cost 1,130,830,000.00                               13,303,882.35
                                                          –
    total construction cost 657,000,000.00                                  7,729,411.76
    total financial charges 118,260,000.00
    total cost of project minus interest 1,012,570,000.00
    % to total cost                                                58.10
    consulting, marketing costs 55,570,000.00                                     653,764.71
                                                          –
    Total project sale value 1,406,000,000.00                               16,541,176.47
    PHASE 1 NEW
    PHASE 1.                           2 UNITS OF EACH TYPE                 6 UNITS
    Cost Item Kshs %
    Land 23,200,000.00 26.28567544
    0.00 0
    Construction 50,150,000.00 56.82011307
    0.00 0
    0.00 0
    Professional fees 2,507,500.00 2.841005654
    Project Management fees 501,500.00 0.568201131
    Marketing 2,875,000.00 3.257384349
    Financial Charges 9,027,000.00 10.22762035
    Total 88,261,000.00 100
    Financing Plan Kshs %
    Developer 38,111,000.00 43.17988693
    Debt Finance 50,150,000.00 56.82011307
    Presales 11,500,000.00 13.02953739
    Total 88,261,000.00 113.0295374
    PROFIT
    TOTAL SALES FOR 6 UNITS 115,000,000.00
    TOTAL EXPENDITURE 88,261,000.00
    NET PROFIT 26,739,000.00
    % Profit Margin 30.29537395
    Take home ammount. 49,939,000.00
  • National Construction Authority Bill 2011

    http://www.kenyafmb.org/documents/National_Construction_Authority_Bill__2011.pdf
    THE NATIONAL CONSTRUCTION AUTHORITY
    BILL, 2011
    ARRANGEMENT OF CLAUSES
    Clause
    PART I!PRELIMINARY
    1!Short title and Commencement.
    2!Interpretation.
    PART II!THE NATIONAL CONSTRUCTION
    AUTHORITY
    3!Establishment and incorporation of Authority.
    4!Headquarters.
    5!Functions of the Authority.
    6!Powers of Authority.
    7!Membership of the Board.
    8!Vacation of office.
    9!Conduct of business and affairs of the Board
    10!Remuneration of Board members.
    11!Delegation by the Authority.
    12!Executive Director.
    13!Staff of the Board.
    PART III!TRADING AS A CONTRACTOR
    14!Reqirement for registration.
    15!Meaning of “Contractor”.
    16!Application for Registration.
    17!Registration of foreign contractors.
    18!Registers of Contractors.
    19!Publication of registers and lists.
    20!Publication prima facie evidence of registration.
    Inquiries by the Board
    21!Inquiry into conduct of contractors.
    22!Suspension.
    The National Construction Authority Bill, 2011 90
    23!Deletion of name.
    24!Powers of the Board with regard to register.
    PART IV!APPEALS BOARD
    25!Establishment.
    26!Board may make rules.
    27!Expenses of the Appeals Board.
    PART V!FINANCIAL PROVISIONS
    28!Funds of the Authority.
    29!Imposition of levy.
    30!Financial year.
    31!Annual estimates.
    32!The National Construction Authority Fund.
    33!Accounts and audit.
    34!Investment of funds.
    PART VI!MISCELLANEOUS
    35!Protection from liability.
    36!Common seal.
    37!Significance of documents.
    38!Protection of name.
    39!Power to dissolve Board.
    40!Power to make Regulations.
    SCHEDULES
    FIRST SCHEDULE!BODIES TO NOMINATE BOARD
    MEMBERS.
    SECOND SCHEDULE!CONDUCT OF THE BUSINESS
    AND AFFAIR OF THE BOARD.
    THIRD SCHEDULE—CLASSES OF CONTRACT WORKS
    MEMORANDUM OF OBEJCTS AND REASONS
    The National Construction Authority Bill, 2011 91
    THE NATIONAL CONSTRUCTION AUTHORITY
    BILL, 2010
    A Bill for
    AN ACT of Parliament to provide for the
    establishment, powers and functions of the
    National Construction Authority and for
    connected purposes
    ENACTED by the Parliament of Kenya, as follows—
    PART I—PRELIMINARY
    Short title and
    Commencement.
    1. This Act may be cited as the National Construction
    Authority Act, 2010, and shall come into operation on such date
    as the Minister may, by notice in the Gazette, appoint.
    Interpretation. 2. In this Act, unless the context otherwise requires–
    Cap. 446
    Cap. 486
    “Authority” means the National Construction Authority
    established
    under section 3;
    “Board” means the Board of the Authority established
    under section 7;
    “ chairperson” means the chairperson of the Board
    appointed under Section 7 (1);
    “class” in relation to contract, means any of the classes of
    contract works set out in the Third Schedule in respect of which
    a contractor may be licensed by the Board;
    “Committee” means the State Corporations Advisory
    Committee established under the State Corporations Act;
    “company” means a company within the meaning of the
    Companies Act;
    “construction site supervisor” means a person assigned to the
    construction site by a contractor to supervise construction
    works;
    “construction industry” means the industry concerning
    construction works;
    The National Construction Authority Bill, 2011 92
    “construction works” means the construction, extension,
    installation, repair, maintenance, renewal, removal, renovation,
    alteration, dismantling, or demolition of-(a) any building, erection, edifice, structure, wall, fence or
    chimney, whether constructed wholly or partly above
    or below ground level ;
    (b) any road, harbour works, railway, cableway, canal or
    aerodrome;
    (c) any drainage, irrigation or river control works;
    (d) any electrical, mechanical, water, gas, petrochemical or
    telecommunication works; or
    (e) any bridge, viaduct, dam, reservoir, earthworks,
    pipeline, sewer, aqueduct, culvert, drive, shaft, tunnel
    or reclamation works, and includes any works which
    form an integral part of, or are preparatory to or
    temporary for the works described in paragraphs (a) to
    (e), including site clearance, soil investigation and
    improvement, earth-moving, excavation, laying of
    foundation, site restoration and landscaping.
    “contractor” means a person registered under section 15;
    “executive director” means the executive director of the
    Authority appointed under section 12;
    “member” in relation to the Board or the Appeals
    Authority includes the chairman and the vice-chairman;
    “Minister” means the Minister for the time being
    responsible for matters relating to public works;
    “person” includes a firm or body of persons, whether
    corporate or unincorporate;
    “register” means the Register of Contractors maintained by
    the Authority in accordance with the provisions of this Act;
    “registered” in relation to any contractor means a contractor
    whose name is entered in the relevant register;
    “Registrar” means the executive director;
    The National Construction Authority Bill, 2011 93
    PART II—THE NATIONAL CONSTRUCTION
    AUTHORITY
    Establishment and
    incorporation of
    Authority.
    3. (1) There is hereby established an Authority to be known
    as the National Construction Authority.
    (2) The Authority shall be a body corporate with perpetual
    succession and a common seal and shall, in its corporate name,
    be capable of –
    (a) suing and being sued;
    (b) taking, purchasing or otherwise acquiring, holding,
    charging or disposing of movable and immovable
    property; and
    (c) borrowing and lending money; and
    (d) doing or performing all other things or acts which may
    be lawfully done or performed by a body corporate for
    the furtherance of the provisions of this Act.
    Headquarters.
    4. The Headquarters of the Authority shall be in Nairobi.
    Functions of the
    Authority.
    5. (1) The object for which the Authority is established is to
    oversee the construction industry and coordinate its
    development.
    (2) Without prejudice to the generality of subsection (1), the
    Authority shall!
    (a) promote and stimulate the development, improvement
    and expansion of the construction industry;
    (b) advise and make recommendations to the Minister on
    matters affecting or connected with the construction
    industry;
    (c) undertake or commission research into any matter
    relating to the construction industry;
    (d) prescribe the qualifications or other attributes required
    for registration as a contractor under this Act;
    (e) assist in the exportation of services connected to the
    construction industry;
    The National Construction Authority Bill, 2011 94
    (f) provide consultancy and advisory services with respect
    to the construction industry;
    (g) promote quality assurance in the construction industry;
    (h) encourage the standardisation and improvement of
    construction techniques and materials;
    (i) initiate and maintain a construction industry
    information system;
    (j) provide, promote, review and co-ordinate training
    programmes organized by public and private
    accredited training centers for skilled construction
    workers and construction site supervisors;
    (k) accredit and register contractors and regulate their
    professional undertakings; and
    (l) accredit and certify skilled construction workers and
    construction site supervisors.
    (3) The Authority shall ensure that the performance of
    functions under this Act is in furtherance of the policy
    Government for the time being in force in relation to the
    construction industry.
    Powers of Authority.
    6. (1) The Authority shall have all the powers necessary for
    the proper performance of its functions under this Act, and, in
    particular, but without prejudice to the generality of the
    foregoing, the Authority shall have power to!
    (a) award certificates of proficiency to contractors, skilled
    construction workers and construction site supervisors;
    (b) with the approval of the Minister, impose fees or any
    other charges as it deems fit in respect of any of its
    functions or powers;
    (c) with the approval of the Minister, establish or expand, or
    promote the establishment or expansion of, companies,
    corporations or other bodies to carry on any activities
    related to construction either under the control or partial
    control of the Authority or independently; and
    (d) receive, in consideration of any services that may be
    rendered by it, such commission or payments as may be
    The National Construction Authority Bill, 2011 95
    agreed upon with any person.
    Membership of the
    Board.
    7. (1) There shall be a Board of the Authority which shall
    consist of—
    (a) a chairperson, who shall to be appointed by the Minister
    from among the members appointed under paragraph
    (f);
    (b) the Permanent Secretary in the Ministry for the time
    responsible for matters relating to public works;
    (c) the Permanent Secretary in the Ministry for the time
    responsible for matters relating to roads;
    (d) the Permanent Secretary in the Ministry for the time
    being responsible for matters relating to local
    government;
    (e) the Permanent Secretary to the Treasury;
    (f) seven members, comprising representatives of each of
    the organizations specified in Part I and II of the First
    Schedule and appointed by the Minister, from amongst
    three persons nominated by each of the organizations;
    and
    (g) one member appointed by the Minister to represent
    groups with special interests in the construction industry.
    (2) The Minister may, by notice in Gazette, amend the
    First Schedule.
    (3) The members referred to under subsection (1) (b) (c)
    and (d) and (e) may in writing, designate any officer not below
    the level of Deputy Secretary to represent them on the Board.
    (4) A person nominated by the associations set out in
    Part II of the First Schedule shall qualify for appointment as a
    member of the Board under paragraphs (1)(f) and if such person
    is the holder of a Kenya Certificate of Secondary Education or
    equivalent qualification and has at least ten years’ practical
    experience in the construction industry.
    (5) The chairperson and members of the Board, other
    than the ex-officio members, shall hold office for a period of
    three years from the date of appointment, but shall be eligible for
    re-appointment for one further term.
    The National Construction Authority Bill, 2011 96
    Vacation of office.
    8. The office of a member of the Board, other than an ex
    officio member, shall become vacant if the member!
    (a) resigns his office by notice in writing addressed to the
    Minister;
    (b) is absent from three consecutive meetings of the Board
    without the permission of the chairperson;
    (c) is convicted of an offence by a court and sentenced to
    imprisonment for a term of six months or more without
    the option of a fine;
    (d) is convicted of an offence involving fraud, dishonesty or
    moral turpitude;
    (e) is unable, by reason of mental or physical infirmity, to
    discharge his functions as a member of the Board ;
    (f) is otherwise unable or unfit to continue serving as
    member of the Board, or
    (g) dies.
    Conduct of business and
    affairs of the Board.
    9. The conduct and regulation of the business and affairs of
    the Board shall be as provided in the Second Schedule, but
    subject thereto
    the Board may regulate its own procedure.
    Remuneration of Board
    members.
    10. (1) There shall be paid to the members of the Board
    such remuneration, fees or allowances for expenses as the
    Minister, in consultation with the Committee, may approve.
    Delegation by the
    Authority.
    11. The Board may, by resolution either generally or in any
    particular case, delegate to any of its committees or to any
    member, officer, employee or agent of the Board, the exercise of
    any of the powers or the performance of any of the functions or
    duties of the Board under this Act or under any other written law.
    Executive director.
    12. (1) There shall be an executive director of the Authority
    who shall be appointed by the Board and whose terms and
    conditions of service shall be specified in the instrument of
    appointment or otherwise in writing from time to time.
    (2) A person shall be qualified for appointment under this
    section where such person is a holder of a degree from a
    recognized university in –
    (a) architecture ;
    (b) quantity surveying, or
    (c) engineering,
    The National Construction Authority Bill, 2011 97
    and is registered as a professional under the relevant law for the
    time being in force, and has at least ten years’ experience in a
    management position in a private or public organization.
    (3) The executive director shall –
    (a) be the chief executive officer of the Authority and
    responsible to the Board for the day-to-day
    management of the affairs of the Authority; and
    (b) be the Secretary to the Board and the Registrar of
    contractors.
    Staff of the Board.
    13. The Board may appoint such officers or other staff as
    may be necessary for the proper discharge of the functions of the
    Authority under this Act or any other written law, upon such
    terms and conditions of service as the Board may determine
    PART III!TRADING AS A CONTRACTOR
    Requirement for
    registration.
    14. (1) A person shall not carry on the business of a
    contractor unless the person is registered by the Board under this
    Act.
    (2) A person seeking registration under subsection (1) shall,
    in the case of a firm, be eligible for registration if at least one of
    the partners or directors of the firm possesses such technical
    qualifications, skills or experience as the Board may from time to
    time prescribe.
    Meaning of
    “Contractor”.
    15. (1) For the purposes of this Act, a person carries on
    business as a contractor where such person, for reward or other
    valuable consideration, undertakes the construction, installation
    or erection, for any other person, of any structure situated below,
    on or above the ground, or other work connected therewith, or
    the execution, for any other person, of any alteration or otherwise
    to any structure or other work connected therewith, and
    undertakes to a supply-(a) the materials necessary for the work, or is authorized to
    exercise control over the type, quality or use of the
    materials supplied by any other person;
    (b) the labour necessary for the work, or is authorized on
    behalf of the person for whom the work is undertaken
    or any other person, to employ or select workmen for
    employment for the purposes of the execution of the
    work, whether under a contract of service or otherwise:
    The National Construction Authority Bill, 2011 98
    Provided that a person shall not be deemed to be a
    contractor if the work undertaken!
    (i) does not incur a cost exceeding such sum or sums
    as the Board may from time to time determine; or
    (ii) consists of a residential house for private use, not
    requiring a structural design.
    (2) The Board shall register eligible contractors to
    undertake any of the classes of contracted works set out in the
    Third Schedule depending on their knowledge and experience.
    (3) The Minister may by notice in the Gazette amend the
    Third Schedule.
    Application for
    Registration.
    16. (1) A person or firm may apply to the Board for
    registration as a contractor for purposes of this Act.
    (2) An application for registration shall be in the prescribed
    form and shall be accompanied by the prescribed fee, and shall
    demonstrate to the satisfaction of the Board that the person, or, in
    the case of a firm, at least one director or partner thereof!
    (a) is the holder of the minimum technical qualifications
    and skills prescribed by the Board for the class of
    contract works in respect of which registration is
    sought;
    (b) has the necessary experience prescribed by the Board
    in works involving construction, erection, installation,
    alteration or any other activity connected therewith;
    (c) has professional and general conduct which in the
    opinion of the Board, makes the person suitable to be
    registered under this Act; and
    (d) has the necessary plant and equipment for the category
    of works for which the registration is sought.
    (3) The Board may refuse to register a person as a
    contractor if in its opinion that person!
    (a) does not meet the conditions stated in subsection (2);
    (b) is a member of a consulting firm providing
    architectural, quantity surveying or engineering
    The National Construction Authority Bill, 2011 99
    services, unless the person is authorized to seek such
    registration by the respective registration board; or
    (c) is a person whose registration as a contractor shall
    result in conflict of interest with his employer.
    (4) Upon registration, the person shall be issued with a
    certificate of registration indicating the registration number, the
    class of works for which registered, the date of registration and
    duration of registration.
    (5) The certificate issued under subsection (3) shall
    remain the property of the Authority and shall be withdrawn and
    returned to the Authority upon suspension or cancellation of the
    registration of the holder.
    Registration of foreign
    contractors.
    17. (1) The Board may accredit a firm incorporated outside
    Kenya to carry out construction works in Kenya, for a prescribed
    period where the firm meets the conditions prescribed by the
    Board and satisfies the Board that the firm -(a) intends to be present in Kenya only for the purpose of
    carrying out the specific works for which it has been
    contracted, for which, the sum payable is not less than
    the sum prescribed by the Board for the class of works
    in respect of which registration is sought;
    (b) has a certificate of compliance from the Registrar of
    Companies showing that it is, or immediately prior to
    entering Kenya, was, trading as a contractor in the
    capacity which satisfies the Board with respect to its
    suitability to serve the public as a qualified contractor;
    and
    (c) has lodged an affidavit with the Board to the effect that,
    once the contracted works are completed and the period
    of defects liability or maintenance has elapsed, it shall
    wind up business and shall not engage itself in the
    construction business within Kenya.
    (2) The Board may require an applicant under this
    section to appear before it and produce documentary evidence of
    its competence in executing construction works immediately
    prior to its entry in Kenya.
    (3) Registration of a firm under this section shall entitle
    it to undertake work only for the period of time prescribed by the
    Board in subsection (1), and on the expiry of that period that firm
    The National Construction Authority Bill, 2011 100
    shall cease to be so registered, and shall return the registration
    certificate to the Board.
    (4) A firm registered under this section shall during the
    period of the contracted works, and in relation to things done or
    omitted to be done in the course of the contracted works, be
    treated as being duly registered under this Act as a contractor.
    Registers of Contractors.
    18.(1) The Registrar shall keep and maintain registers in
    which the name of every registered contractor shall be entered as
    soon as practicable after being approved by the Board for
    registration.
    (2) The register shall contain, in respect of every person
    or firm!
    (a) the date of registration;
    (b) the physical and postal address;
    (c) the registration number;
    (d) the class of works for which the person is registered;
    (e) the capital and other financial resources;
    (f) tools, plants and equipment;
    (g) the key managerial, professional or technical and other
    personnel;
    (h) names and qualifications of directors or partners, who
    are technically qualified or experienced in the relevant
    works as prescribed by the Board;
    (i) in the case of an individual, his qualifications or skills
    and experience;
    (j) the annual turnover of construction activities;
    (k) the duration of registration;
    (l) the type of registration; and
    (m) any other particulars which the Board may, from time
    to time, direct.
    (3) The Registrar shall maintain separate registers in
    The National Construction Authority Bill, 2011 101
    respect of the different classes of works, and shall record any
    changes in any of the particulars set out under subsection (1).
    Publication of registers
    and lists.
    19. (1) The Registrar shall by notice published in the
    Gazette, as soon as practicable after registration, publish the
    names and particulars of all persons registered by the Board, and
    shall, as soon as practicable after the 1
    st
    January and the 1
    st
    June
    in each year, publish in the Gazette the names and particulars of
    all contractors whose names remain on the register as at those
    dates.
    Publication prima facie
    evidence of registration.
    20. (1) Publication of the name of a person in the Gazette
    under section 19 shall be prima facie evidence that the person is
    registered under this Act.
    (2) The registers, and any lists, copies, or extracts thereof,
    which are duly certified by the executive director shall be
    accepted in all courts and tribunals or other bodies authorized to
    receive evidence of the facts stated in them.
    (3) Any person may inspect the register and any document
    relating to any entry in it and may obtain from the Registrar a
    copy of an extract from the register for any document on
    payment of a prescribed fee.
    Inquiry into conduct of
    contractors.
    Inquiries by the Board
    21.(1) The Board may institute an inquiry into the conduct
    of a contractor on its own initiative or upon receipt of a
    complaint addressed to the Board in writing, made by or on
    behalf of any person alleging unprofessional conduct on the part
    of a registered person.
    (2) The Board may conduct such inquiry or refer it to a
    subcommittee appointed by the Board for the purpose.
    (3) Upon receipt of a complaint against a contractor, the
    Board shall inform the person complained of, giving the grounds
    of the complaint, by notice sent to the contractor’s last address
    acknowledged by the Registrar.
    (4) The Board may call upon the contractor whose conduct
    is complained of or is under investigation to file, within a
    specified period, an explanation in answer to the complaint, and
    may require such explanation to be verified by affidavit.
    The National Construction Authority Bill, 2011 102
    (5) The Board may summon before it or before a
    subcommittee established for the purpose, any contractor against
    whom a complaint is lodged or whose conduct may appear to the
    Board to require investigation, and may call upon such contractor
    to produce any document, contract, book, paper, specification,
    quantities or other writing in that contractor’s control in any way
    relating to or concerning the complaint or matter under
    investigation, and may hear any evidence and inspect any
    document which the complaint or the party complained against
    may desire to adduce.
    (6) The contractor against whom a complaint is made shall
    have the right to appear before the Board and to be heard either
    personally or through his advocate, and may call such evidence
    and produce such documents as may be relevant.
    (7) Any contractor who, having been served with a summons
    or an order issued under the provisions of subsection (5), fails
    without sufficient cause!
    (a) to answer fully and satisfactorily to the best of his
    knowledge and belief all questions put to him by or with
    the concurrence of the Board; or
    (b) to produce any documents in his possession or under his
    control which are specified in the order,
    commits an offence and is liable upon conviction to a fine not
    exceeding than ten thousand shillings or to imprisonment for a
    term not exceeding one year or to both.
    (8) Any person giving evidence before the Board shall in
    respect of any evidence given by him or any document produced
    by him, be entitled to all privileges to which he would be entitled
    as a witness before the High Court.
    (9) The Board, having inquired into the alleged misconduct
    of any Contractor, may!
    (a) caution the Contractor;
    (b) direct the to take such action as it may deem appropriate
    in the circumstances;
    (c) direct that the registration of the Contractor be
    suspended for such period as it may specify; or
    (d) direct that the name of the contractor be removed from
    the register.
    Suspension.
    22. (1) The Board shall have power to suspend any contractor
    if such or !
    The National Construction Authority Bill, 2011 103
    (a) is convicted of an offence under this Act;
    (b) is found guilty of any act or omission amounting to
    improper, disgraceful conduct or gross professional
    misconduct, after due inquiry held by the Board; or
    (c) has breached the regulations or by-laws of the Authority.
    (2) In addition to the power to suspend registration given
    under subsection (1) the Board may!
    (a) caution or censure a registered contractor;
    (b) direct that the registration of the contractor be suspended
    for such period as it may specify;
    (c) direct that the contractor’s name be deleted from the
    Register; or
    (d) take legal action against the registered contractor.
    Deletion of name.
    23. (1) The Board may at any time direct that the name of a
    registered contractor be deleted from the register where that
    contractor !
    (a) fails, within a period of six months from the date of an
    inquiry sent by the Registrar by registered letter to the
    address appearing in the register against his name, to
    notify the Registrar of his current address;
    (b) requests that the name be deleted from the register, in
    which case that contractor may be required to satisfy the
    Board by swearing an affidavit certified by a
    commissioner for oaths and lodged with the Registrar
    that no criminal proceedings under section 20 or 21 of
    this Act are being, or are likely to be, taken against the
    contractor;
    (c) fails to pay annual subscription fees for two consecutive
    years;
    (d) fails to meet the registration criteria set by the Authority;
    (e) fails to discharge the duties, responsibilities and
    obligations of a contractor;
    (2) The Registrar shall delete the name of every
    deregistered contractor from the register.
    The National Construction Authority Bill, 2011 104
    (3) Except in the circumstances specified in
    subsection(1)(a) and subsection (2), the deletion of the name of
    any contractor from the register shall be notified by the Registrar
    to that contractor by a recorded delivery or a registered letter to
    the address appearing in the register against his name
    immediately prior to the deletion.
    (4) A contractor whose name has been deleted from the
    register under this section shall, with effect from the date of the
    deletion, cease to be registered for the purpose of this Act, and
    shall be obliged to immediately surrender to the Board the
    certificate of registration for cancellation.
    (5) Where the name of any contractor has been deleted
    from the register, that contractor shall not be registered afresh
    under any other name.
    Powers of the Board
    with regard to register.
    24. (1) Where the name of any contractor has been deleted
    from the register such name shall not be restored to the register
    except on the direction of the Board.
    (2) Where the name of any contractor has been deleted
    from the register or the contractor has been suspended in terms
    under 22, the Board may, either of its own motion or on
    application in the prescribed manner by the contractor concerned,
    and in either case after holding such inquiry as the Board may
    deem fit, direct that!
    (a) the deletion of the contractor’s name from the register
    be confirmed ;
    (b) the name of that contractor be restored to the register; or
    (c) the suspension of the contractor be lifted.
    (3) A direction by the Board under subsection (2) may
    include a provision of the date for -(i) the restoration of the contractor’s name to the
    register;
    (ii) the lifting of the suspension of the contractor; or
    (iii) the payment by the contractor of such penalty, not
    exceeding the fee payable for registration, as the
    Board may determine.
    (4) Any contractor aggrieved by a decision of the Board to—
    (a) refuse to register the contractor;
    (b) delete the contractor’s name from the register; or
    (c) suspend the contractor;
    may appeal to the Appeals Board against the decision of the
    Board and the Appeals Board may give such directions in the
    The National Construction Authority Bill, 2011 105
    matter as it deems proper.
    (5) The Board may appear as respondent and be heard on
    any appeal against its decision and, for the purposes of enabling
    directions to be given as to the costs of any appeal, the Board
    shall be deemed to be a party thereto, whether or not it shall
    appear at the hearing of the appeal.
    Establishment.
    PART IV—APPEALS BOARD
    25. (1) There is established a board to be known as the
    National Construction Appeals Board (hereinafter referred to as
    “the Appeals Board”).
    (2) The Appeals Board shall consist of the following
    persons, who shall be appointed by the Minister!
    (a) a chairperson, being an advocate of the High Court of
    Kenya, who shall be nominated by the Attorney-General;
    (b) a person with professional knowledge and experience
    in architecture, quantity surveying, engineering,
    building surveying or project management; and
    (c) a person nominated by the Chartered Institute of
    Arbitrators (Kenya Chapter).
    (3) An appeal shall lie to the Appeals Board at the suit of
    any person aggrieved by a decision of the Board under section.
    (4) A person aggrieved by the decision of the appeals
    Board may appeal to the High Court.
    Board may make the
    rules
    26. The Appeals Board may make rules for or with respect
    to the filing, hearing and disposal of appeals and other matters
    before it.
    Expenses of the Appeals
    Board.
    27. The expenses of the Appeals Board shall be provided
    by the Ministry.
    PART V – FINANCIAL PROVISIONS
    Funds of the Authority.
    28. The funds of the Authority shall consist of –
    (a) such income as may be provided by Parliament for the
    purposes of the Authority;
    The National Construction Authority Bill, 2011 106
    (b) such monies as may accrue to the Authority in the
    performance of its functions under this Act;
    (c) all the proceeds of the levy imposed under section 29;
    and
    (d) all monies from any other source provided for or donated
    or lent authority.
    Imposition of levy.
    29. (1) The Minister may, by notice in the Gazette, impose
    a levy to be known as the construction levy on construction work
    carried out by persons registered under this Act.
    (2) The levy shall be in an amount not exceeding an
    equivalent of 0.25% of the value of any contract whose value
    exceeds five million shillings.
    (3) The Minister may make regulations prescribing the
    manner of payment of the levy.
    Financial year.
    30. The financial year of the Authority shall be the period of
    twelve months ending on the thirtieth June in each year.
    Annual Estimates.
    31. (1) At least three months before the commencement of a
    financial year, the Board shall cause to be prepared the estimates
    of revenue and expenditure of the Authority for that year.
    (2) The annual estimates shall make provision for all estimated
    expenditure of the Authority for the financial year, and, in
    particular, shall make provision for!
    (a) the payment of salaries, allowances, pension gratuities,
    and other changes in respect of the staff of the Authority;
    (b) proper maintenance of the buildings and grounds of the
    Authority; and
    (c) the maintenance, repair and replacement of the utilities,
    equipment and other property of the Authority.
    (3) The annual estimates shall be approved by the Board
    before the commencement of the financial year to which they
    relate, and shall be submitted to the Minister for approval, and
    thereafter the Authority shall not increase or decrease the annual
    estimates except with the authority of the Minister.
    The National
    Construction Authority
    Fund.
    32. (1) There shall be established a Fund to be known as the
    National Construction Fund, which shall vest in the Authority.
    (2) There shall be paid into the Fund!
    The National Construction Authority Bill, 2011 107
    (a) the initial budgetary provision by the Government as
    start-up capital for the establishment of the Authority;
    (b) the charges levied on contractors on services given by the
    Authority;
    (c) such moneys or assets as may accrue to or vest in the
    Authority in the course of the exercise of its powers or
    the performance of its functions under this Act or under
    any other written law;
    (d) all proceeds from the levy imposed under section 26; and
    (e) all moneys from any other source provided for or donated
    or lent to the Authority;
    (3) All receipts, savings and accruals for the Fund and the
    balance of the Fund at the end of the financial year shall be
    retained for the purposes for which the Fund is established.
    (4) There shall be paid out of the Fund any expenditure
    incurred by the Authority in the exercise of its powers or the
    performance of its functions under this Act.
    (5) The Board may with the approval of the Minister, set a
    ceiling of the money which may be spent on recurrent
    expenditure in any one year.
    Accounts and audit.
    No 12 of 2003
    33. (1) The Board shall cause to be kept all proper books and
    records of account of the income, expenditure and assets of the
    Authority.
    (2) Within a period of three months from the end of each
    financial year, the Authority shall submit to the Controller and
    Auditor General the accounts of the Authority together with—
    (a) a statement of the income and expenditure of the
    Authority during that year; and
    (b) a statement of the assets and liabilities of the Authority
    on the last day of that year.
    (3) The accounts of the Authority shall be audited and
    reported upon in accordance with the Public Audit Act, 2003.
    (4) The Authority shall ensure that in any financial year
    expenditure and commitments from the Account shall not exceed
    The National Construction Authority Bill, 2011 108
    the annual income of the Fund together with any surplus income
    brought forward from a previous year.
    Investment of funds.
    34. (1) The Authority may, with the approval of the
    Minister!
    (a) invest any of its surplus funds in Government securities;
    (b) place or deposit with any banks quoted on an approved
    securities exchange in Kenya as it may determine, any
    moneys not immediately required for the purposes of the
    Authority.
    Cap. 485A.
    (2) In this section, “approved securities exchange” means
    a securities exchange approved under the Capital Markets Act.
    PART VI—MISCELLANEOUS
    Protection from liability.
    35. (1) No matter or thing done by a member of the Board
    or any officer, employee or agent of the Authority shall, if the
    matter or thing is done bona fide for executing the functions,
    powers or duties of the Authority under this Act, render the
    officer, employee or agent or any person acting under their
    direction liable to any action, claim or demand whatsoever.
    (2) The provisions of subsection (1) shall not relieve the
    Authority of the liability to pay compensation or damages to any
    person for any injury to him, his property or any of his interests
    caused by the exercise of the powers conferred on the Authority
    by this Act or by any written law or by the failure, whether
    wholly or partially, of any works.
    Common seal.
    36. (1) Subject to this section, the common seal of the
    Authority shall be kept in the custody of the Executive Director
    or of such other person as the Board may direct, and shall not be
    used except upon the order of the Board.
    (2) The common seal of the Authority shall be authenticated
    by the signature of the chairperson and the executive director.
    (3) The common seal of the Authority, when affixed to any
    document and duly authenticated under this section, shall be
    judicially and officially noticed, and, unless the contrary is
    proved, the necessary order or authorization of the Council under
    this section shall be deemed to have been duly given.
    Signification of
    documents.
    37. All documents other than those required by law to be
    under seal made on behalf of the Board shall be signified by the
    The National Construction Authority Bill, 2011 109
    hand of the chairman of the Board, the Executive Director, or
    any other member of the Council specifically authorized by the
    Council in that behalf.
    Protection of name.
    38. Any person who, without the written consent of the
    Board, uses the words “National Construction Authority” in
    furtherance of , or as, or in connection with , any advertisement
    for any trade, business, calling or profession, commits an offence
    and is liable on conviction to imprisonment for a term not
    exceeding twelve months or a fine not exceeding thirty thousand
    shillings or to both such fine and imprisonment.
    Power to dissolve
    Board.
    39. Notwithstanding any other provision of this Act, the
    Minister may by notice in the Gazette dissolve the Board where
    the Board performs its functions in a manner which is
    inconsistent with this Act.
    Power to make
    Regulations.
    40. (1) The Minister may in consultation with the Board,
    make regulations generally for the better carrying out of the
    purposes of this Act.
    (2) Without prejudice to the generality of the foregoing,
    regulation made under this section may provide for!
    (a) the manner of payment of the levy imposed under
    section 29;
    (b) the manner of service of any notice required under
    Act;
    (c) the fees and charges to be paid in respect of any matter
    required for purposes of this Act;
    (d) the manner and forms of accreditation and certification
    of contractors, skilled construction workers and
    construction site supervisors;
    (e) the responsibilities and control of the officers and
    servants of the Authority;
    (f) the performance of the functions, the exercise of the
    powers and discharge of the duties of the Authority
    under this Act, and
    (g) any other matter to give effect to the provisions of this
    Act.
    The National Construction Authority Bill, 2011 110
    FIRST SCHEDULE (S.7(1)(f)
    Bodies to Nominate Board members
    PART I
    1. Architectural Association of Kenya;
    2. The Institution of Engineers of Kenya;
    3. The Institute of Quantity Surveyors of Kenya;
    4. Law Society of Kenya.
    PART II
    1. The Kenya Federation of Master Builders,
    2. The Kenya Association of Building and Civil
    Engineering Contractors
    3. The Roads and Civil Engineering Contractors
    Association.
    SECOND SCHEDULE (S.9)
    CONDUCT OF THE BUSINESS AND AFFAIRS OF
    THE BOARD
    1. The Board shall meet at least four times in every
    financial year and not more than two months shall elapse
    between the date of one meeting and the date of the next meeting.
    2. Notwithstanding paragraph 1, the chairperson may at any
    time, and shall, within one month of the receipt by him of a
    written request signed by at least seven members of the Board,
    convene a special meeting of the Board.
    3. The quorum for the conduct of the business of the Board
    shall be seven members.
    4. The chairperson shall preside at every meeting of the
    Board at which he is present, but in the absence of the
    chairperson the members present shall elect one among their
    number to preside, and such member shall, as concerns that
    meeting, have all the powers of the chairperson.
    5. The decisions of the Board shall be carried by the
    The National Construction Authority Bill, 2011 111
    votes of a majority of the members present, but in the case of an
    equality of votes the chairperson or person presiding shall have
    a casting vote.
    6. The members may appoint committees from among
    themselves or otherwise, to carry out such general or special
    functions as may be specified by the Board.
    7. Any member who has a direct or indirect interest in any
    decision to be taken on any specific matter by the Board, shall
    disclose the nature of such interest at the meeting of the Board
    where such decision is being taken, and the disclosure shall be
    recorded in the minutes of the meeting, and if majority of the
    members of the Board believe that such member’s interest in the
    matter is such as to influence his judgment, he shall not
    participate in the deliberation or the decision of the Board on
    such matter.
    8. Except as provided in this Schedule, the Board may
    regulate its own procedure.
    THIRD SCHEDULE (S.15(2)
    CLASSES OF CONCTRACT WORKS
    A—Building Works
    (a) General Building Contractor;
    (b) Carpentry/Joinery;
    (c) Painting;
    (d) Masonry;
    (e) Reinforced masonry works;
    (f) Specialized building works.
    B—Civil Engineering
    (a) Roadworks;
    (b) Structural Works;
    (c) Boreholes;
    (d) Site Investigation Works;
    (e) Sewers.
    C – Electrical Engineering Services
    (a) Electrical Installation;
    (b) Electronic
    (i) Telecommunications 9PABX, intercoms and
    telephone wiring);
    The National Construction Authority Bill, 2011 112
    (ii) Electronic communications (public address systems
    and conferences systems);
    (iii) Road Communications;
    (iv) Structured Cabling and computer networking
    Installations;
    (v) Security Surveillance Systems (CCTV and intruder
    Alarm systems)
    (c) Lift and Escalators Installation;
    (d) Generating Plants and Control Panels;
    (e) Solar Power Generation;
    (f) Photovoltaic Installation.
    D—Mechanical Engineering Services
    (a) Plumping, Drainage and Sanitary Fittings;
    (b) Refrigeration, Air-Conditioning and Ventilation;
    (c) Kitchen and Laundry Equipment and refuse disposal
    systems;
    (d) Boilers, Incinerators and Pressure Vessels;
    (e) Solar Heating Systems;
    (f) Water Tanks, Treatment Plant and Pumping plant;
    (g) Compressed Air, Hydraulic, LP and Medical Gas
    Installation;
    (h) Cranes and Hoists;
    (i) Fire Engineering Services;
    (j) Health club facilities;
    (k) Borehole equipment;
    (l) Hospital Equipment;
    (m) Mobile shelving.
    The National Construction Authority Bill, 2011 113
    MEMORANDUM OF OBJECTS AND REASONS
    The main purpose of this Bill is to provide a legal and institutional framework for
    the development of the local construction industry. This will be achieved
    through capacity building and training and the regulation of contractors.
    Part I of the Bill contains preliminary provisions.
    Part II of the Bill establishes and incorporates the National Construction
    Authority and assigns functions to it. The Authority is mandated to oversee the
    construction industry and co-ordinate its development. Among its functions are
    the promotion of the development of the industry, registration of contractors, the
    standardization and improvement of construction techniques and materials and
    accreditation and certification of skilled construction workers and construction
    site supervisors. The Authority is empowered to, among other things, establish
    or promote the establishment of construction companies.
    Under this Part is established the Authority whose membership comprises
    representatives of professional and other construction-related organizations and
    representative of a special interest group.
    Part III has provisions on trading as a contractor.
    Clause 15 defines the activities to which the Bill relates.
    The Part has provisions on the registration of local and foreign contractors and
    the conditions attaching to each.
    The Board is empowered to carry out inquiries into the conduct of registered
    contractors and impose sanctions where appropriate, including suspension of
    registration and deletion of the offending contractor’s name from the register.
    Part IV contains the financial provisions. These include the powers of the
    Minister to impose a levy on construction work, and the establishment of a Fund
    into which the same and other funds of the Authority should be paid.
    Part V has several miscellaneous provisions, including the power of the Minister
    to dissolve the Board where it acts in a manner inconsistent with the enacted
    provisions, and the power to make regulations.
    The First Schedule to the Bill has the list of bodies which may nominate
    members to the Board.
    The Second Schedule provides for the conduct of the business of the Board.
    The National Construction Authority Bill, 2011 114
    The Third Schedule specifies the classes of works in respect of which a
    contractor may be registered to operate under the Act.
    The enactment of this Bill shall occasion additional expenditure of public funds
    in the first three years after its enactment, which shall be provided for in the
    estimates. It is expected that thereafter the Authority shall become self-sustaining from its revenue.
    Dated the 4th January, 2011.
    C. M. OBURE,
    Minister for Public Works.

  • High rise Housing project, Bamburi, Mombasa

    HOUSING PROJECT, BAMBURI, MOMBASA

     

    Cost Item

    Kshs

    %

    Land

    330,000,000.00

    24.79599657

    Preliminary

    2,400,000.00

    0.180334521

    Construction

    756,000,000.00

    56.80537397

    External Works

    22,680,000.00

    1.704161219

    Contingency

    11,340,000.00

    0.85208061

    Professional fees

    37,800,000.00

    2.840268698

    Project Management fees

    7,560,000.00

    0.56805374

    Marketing

    27,000,000.00

    2.028763356

    Financial Charges

    136,080,000.00

    10.22496731

    Total

    1,330,860,000.00

    100

    Financing Plan

    Kshs

    %

    Developer

    574,860,000.00

    43.19462603

    0.00

    0

    Debt Finance

    756,000,000.00

    56.80537397

    Presales

    6,750,000.00

    0.507190839

    Total

    1,330,860,000.00

    100.5071908

    PROFIT
    TOTAL SALES FOR 240 UNITS

    1,800,000,000.00

    TOTAL EXPENDITURE

    1,330,860,000.00

    NET PROFIT

    469,140,000.00

    % Profit Margin

    35.2508904

    Take home ammount.

    799,140,000.00

  • HOUSING PROJECT, BAMBURI, MOMBASA

     

    HOUSING PROJECT, BAMBURI, MOMBASA

     

    Cost Item

    Kshs

    %

    Land

    330,000,000.00

    24.79599657

    Preliminary

    2,400,000.00

    0.180334521

    Construction

    756,000,000.00

    56.80537397

    External Works

    22,680,000.00

    1.704161219

    Contingency

    11,340,000.00

    0.85208061

    Professional fees

    37,800,000.00

    2.840268698

    Project Management fees

    7,560,000.00

    0.56805374

    Marketing

    27,000,000.00

    2.028763356

    Financial Charges

    136,080,000.00

    10.22496731

    Total

    1,330,860,000.00

    100

    Financing Plan

    Kshs

    %

    Developer

    574,860,000.00

    43.19462603

     

    0.00

    0

    Debt Finance

    756,000,000.00

    56.80537397

    Presales

    6,750,000.00

    0.507190839

    Total

    1,330,860,000.00

    100.5071908

    PROFIT
    TOTAL SALES FOR 240 UNITS

    1,800,000,000.00

    TOTAL EXPENDITURE

    1,330,860,000.00

    NET PROFIT

    469,140,000.00

    % Profit Margin

    35.2508904

    Take home ammount.

    799,140,000.00

     

  • Kenya. Land for Sale June 2013

    COMMERCIAL PROPERTIES

    LOCATION PROPERTY MIN. AVAILABLE SIZE (FT) PRICE PER SQ FEET NOTES
    1. INDUSTRIAL AREA

    (Commercial Street)

    Godown on 0.5acre 25,000 150M
    1. KILIMANI (Lenana Road/Arwings Kodhek)
    SIFA TOWER 850 12,500 + 1 parking per 1,000 sq ft Completion in June 2014
    1. MOMBASA ROAD

    (former St. James hospital site)

    NEXTGEN PARK

    • Shops and offices
    • Doctors Plaza
    1,000

    500

    Prices available on request Prices are gross and size dependant on floor and purpose i.e. supermarket , office or shopConstruction on-going
    1. NAIROBI CBD
    Tom Mboya Street 250M Has 8 floors, fully occupied
    1. NAKURU TOWN
    MALL 250M
    1. NGONG ROAD

    (Opposite Nakumatt Prestige)

    JADALA PLACE 1,000 13,500 +1,250,000 parking
    1. PARKLANDS

    (Parklands Rd, opp. Post office)

    PARK SUITES 533 14,500 + 1.5M parking Construction on-going
    1. PARKROAD
    1 COMMERCIAL BUILDING 2 shops and 18 rooms. 25M (negotiable) Fully occupied with monthly income of Ksh. 124,300.00
    1. UPPERHILL

    (Next to Traffic police)

    FORTIS TOWERS 1,000 19,000 + 1.5m Parking Construction on-going
    1. WESTLANDS

    (Waiyaki Way, near ABC place)

    THE ADDRESS 1,826 14,000 per sq ft and 1.25M parking One tower, overlooking Muthangari. Ground-breaking in July 2013
    1. WESTLANDS

    (Chiromo Lane)

    LOTUS PLAZA 2,000 14,500 per sq ft80.00 to rent per sq ft 6,700 sq ft floor space x 3 floors
    1. WESTLANDS,

    (Karuna Road)

    WESTERN HEIGHTS 500 15,000 for typical floor and 20,000 for ground floor + 1.5M parking Construction on-going
    1. WESTLANDS, CHIROMO LANE
    MIRAGE 1,000 16,000 + 1.5M parking  Construction on-going, one tower sold, out NEAR ARM

    RESIDENTIAL PROPERTIES

    LOCATION

    PROPERTY

    SIZE (BEDROOMS)

    PRICE NOTES
    1. ATHI RIVER

    EVEREST

    1 bedroom

    2 bedrooms

    3 bedrooms

    2.6M4.2M

    5.7M

    120 units60 units

    60 units

    1. EMBAKASI

    Behind Imara Daima, opp. Transami

    Block of flats

    • 11 units, 1 bed
    • 43 units, studio
    • 2 shops
    35M (negotiable) Rental income of 324,500 per month
    1. GIGIRI

    (behind UNEP)

    Stand alone mansion

    5 bedroom

    85M
    1. HILLVIEW

    4 townhouses

    5 bedroom

    75M each On 1 acreWith a ready embassy client. Income of 1.2M monthly
    1. IMARA DAIMA

    Sunrise Estate

    3 bedroom apartment

    6.5M Next to Riara Springs school
    1. IMARA DAIMA

    Penthouse

    2 bedroom apartment

    4.5M Available immediately
    1. IMARA DAIMA

    (Catherine Ndereva Drive)

    Apartment

    2 bedroom

    4.5M 22 units in apartment block
    1. JUJA, THIKA ROAD

    Bungalow

    3 bedroom

    6.5M ON 0.125 acre
    1. KABETE

    Kabete Green Villas

    3 bedrooms

    4 bedrooms

    65M75M 12 units on 5 acres
    1. KAHAWA WENDANI

    Block of apartments

    20 units,1 bedroom

    10 units, 2 bedroom

    6 units, 3 bedroom

    150M
    1. KAREN

    Karen Palms

    4 bedrooms

    42M 5 units only
    1. KAREN

    (Kerarapon Drive)

    Baraka Park

    Detached maisonettes

    4 bedroom

    25.5M 25 units
    1. KAREN

    (Windy Ridge)

    STAND ALONE

    4 bedroom, 3 ensuite + 3 DSQ

    51M On 1 acre
    1. KAREN

    (Ndege Road)

    STAND ALONE

    5 bedroom

    70M On 1.5 acre
    1. KAREN

    Townhouse

    4 bedroom

    48M Near Karen country club
    1. KAREN

    (near Karen hospital)

    Townhouse

    4 bedrooms

    28M
    1. KAREN, Miotoni

    Villa

    4 bedroom

    54M On 0.5 acre
    1. KASARANI

    Mwiki

    Block of flats

    • 8 units, 2 bed
    • 2 shops
    13.9M Rental income of 120,000 per month
    1. KIAMBU ROAD

    FIVE STAR MEADOWS

    Country Villas

    3 bed (2,280 sq ft)

    4 bed (2,830 sq ft)

    22.95M

    29.95M

    Each on 1/8th acre
    1. KIANDA

    Kianda Gardens

    Townhouses

    3 bedroom + DSQ

    41M

    3,250 SQ FT
    1. KIKUYU

    Ivory Towers

    apartments

    2 bedrooms

    3 bedrooms

    7.5M9.5M Ready for occupation – completed October 2012
    1. KIKUYU

    SHAKIWA GARDENS apartments

    2 bedrooms

    3 bedrooms

    4.8M6.0M Rent: 22,000 p.m.Rent: 27,500 p.m.
    1. KILELESHWA

    Gateway Apartments

    3 bedrooms

    17.5M
    1. KILELESHWA

    Penthouse

    2 bedrooms

    15.5M Rental income of 88,000 p.m.
    1. KILELESHWA

    NGOLU HEIGHTS

    2 bedroom

    3 bedroom

    3 w/en-suite guest

    3 duplex attic

    4 duplex attic

    4w/en-suite guest duplex attic

    • 15m
    • 16m
    • 18m
    • 17m
    • 19m
    • 19.5m
    • 134 Sq mt
    • 185 Sq mt
    • 185 Sq. mt
    • 174 Sq. mt
    • 239 Sq. mt
    • 236 Sq. mt
    1. KILELESHWA

    4 bedroom apartment

    15.2M
    1. KILELESHWA

    Kijani Willows

    Townhouses

    5 bedrooms

    40M 15 units on 1.6 acres
    1. KILELESHWA

    Town house

    22M
    1. KILELESHWA (Ole Kejuado/Nyeri Rd junction)

    Apartments

    3 bedroom with DSQ

    18M Rental income of 100,000 p.m.
    1. KILIMANI

    (Riara Lane)

    Apartment

    4 bedrooms

    18M
    1. KILIMANI

    Karue Court apartment

    3 bedrooms

    16.5M
    1. KISERIAN
    MORA HILLDetached townhouse

    4 bedroom

    13.5M 19 units in total
    1. KISERIAN

    Mora Hill

    4 bedroom bungalow

    13.5M
    1. KITUSURU

    Villa

    5 bedroom, all en-suite, 3 DSQ

    75M
    1. LANGATA

    Langata Park Estate

    5 units of 2 bedrooms flats

    18M Monthly income of Ksh. 100,000
    1. LANGATA

    (Off Amiani Road)

    CHEKULO VILLAS

    Semi-detached town houses

    4 bedroom with self contained DSQ

    20M Beginning stages. On about 1/8th acre each
    1. LAVINGTON

    (Mbaazi Avenue)

    Apartment

    4 bedrooms

    18.5M
    1. LAVINGTON

    Penthouse

    4 bedrooms

    22M 2 bedrooms en-suite with attic level
    1. LAVINGTON

    LAVINGTON VILLAS

    5 bedroom with attic

    52M 2 out of 3 units remaining not inclusive of the main house
    1. LAVINGTON

    (Chalbi Drive)

    PYRAMID

    Townhouses

    5 bedroom

    52M

    6 units in the compound

    1. LAVINGTON

    (Apple Cross Rd)

    PYRAMID SPRINGS

    5 bedroom + study and 2 DSQ

    42M

    3 levels, 9 units on 1.3 acres. Ground breaking stages

    1. LAVINGTON

    Apartment

    4 bedrooms

    33M
    1. LAVINGTON

    (Kabasarian Drive)

    Mansion

    12 bedroom

    120M On 0.75 acres
    1. LAVINGTON

    (Masanduku Lane)

    Apartment

    3 bedrooms

    16M In a compound of 32 units
    1. LORESHO

    Villa

    4 bedroom + 2 DSQ

    70M On 0.5 acre
    1. MLOLONGO

    Vallley View Estate

    3 bedroom bungalow

    5.5M
    1. MLOLONGO

    Bungalow

    3 bedroom

    6M
    1. MOMBASA

    Bamburi Flats

    18 x 1 bedroom

    38M Ideal for investment
    1. MOMBASA

    Milele Luxury apartments

    1 bedroom

    2 bedrooms

    3 bedrooms

    20M24M

    28M

    1. MOMBASA RD

    (former St. James Hospital site)

    NEXTGEN PARK

    1 bedroom

    2 bedroom

    3 bedroom

    2 bedroom deluxe

    10.5 – 12M15.5 – 17M

    24.0 – 26.0M

    17.0M – 18.5M

    Show houses ready(Prices vary according to floor)
    1. MOMBASA ROAD

    (Muthamia Heights Rd.)

    Zen Ruby Apartments

    1 bedroom

    2 bedrooms

    3 bedrooms

    3 M5M

    6M

    1. MOMBASA ROAD

    Maisonette

    4 bedrooms

    11.5M
    1. MOMBASA ROAD

    OYSTER BREEZE

    Apartments

    3 bedroom

    9M 15 units; 2,000 sq. ft
    1. MOMBASA ROAD

    Honey Suckle Apartments

    3 bedroom apartment

    5.0M
    1. MOMBASA ROAD

    Muthama Heights Apartments

    3 bedroom + DSQ

    8.5M
    1. MOMBASA ROAD

    Green Park Bungalows

    4 bedroom

    9.2M On 0.25 acre, with rental income of 45,000
    1. MOMBASA ROAD

    Maisonette

    4 bedroom

    12.5M
    1. MOMBASA ROAD

    Maisonette

    3 bedroom

    10.5M
    1. MOMBASA ROAD (Mlolongo)

    Block of flats

    1 bedroom and single units

    16M Monthly rental income of 144,000 on the 2 completed floors
    1. MOMBASA ROAD, near JKIA Resort

    FIVE STAR GARDENS

    2 bedroom (830 sq ft) 3 bedroom (1130 sq ft)

    5M7M 313 units within 5 courts on 5 acres
    1. NAIVASHA

    SHWARI COUNTRY HOMES

    Exotic 3-bedroom

    23M 4 homes set on a 10-acres ranch
    1. NAIVASHA ROAD

    (Wanyee Road)

    Apartment

    3 bedroom

    8.5M 150 SQM, with rental income of 45,000
    1. NGONG ROAD

    (After Junction)

    Apartments to let

    2 bedrooms

    3 bedrooms

    3 bedroom + DSQ

    57,000 per month72,000 per month

    77,000 per month

    91 SQ M141 SQ M
    1. PARKLANDS

    (6TH Avenue)

    Muthaiga Heights

    3 bedrooms

    25M – 35M Type A : 1,615 sq ftType B: 2,100 sq ft

    Type C : 2,283 sq ft

    1. PARKLANDS

    CITY PARK APARTMENTS

    3 bedroom with DSQ

    18M Beginning stages
    1. PARKLANDS

    Apartments

    4 bedroom

    3 bed penthouses,

    23.5M
    1. RIVERSIDE

    Stand-alone house

    6 bedrooms

    130M On 0.387 acres; with gym, Jacuzzi, sauna
    1. RIVERSIDE

    Villa

    5 bedroom, all ensuite, 3 DSQ

    82M On 0.5 acre
    1. RUIRU

    Monarch Apartments

    2 bedrooms, master en-suite

    3 bedrooms, master en-suite

    Cash: 5.57M Installments: 5.79MCash: 6.5M Installments: 6.75M Mortgage available @ 6MMortgage available @ 7M
    1. RUNDA

    Runda Meadows

    4 bedrooms

    65M Single unit
    1. RUNDA

    Runda Grove

    5 bedroom house

    65M On 0.5 acre
    1. SOUTH B

    Great Wall apartments

    2 bedrooms

    3.9M
    1. SOUTH B

    (Opposite Ole-Sereni)

    Apartments

    3 bedroom

    8M Rental income of 50,000 per month
    1. SOUTH C

    Medina Park

    3 bedroom apartment

    7.5M 3 units available, income of 30,000 per month each
    1. SPRING V ALLEY

    River View villa

    4 bedrooms

    105M On 0.5 acre
    1. SPRING VALLEY

    (Opposite Police Station)

    Mansion

    5 bedroom house

    90M On 0.5 acre
    1. TENA ESTATE

    Apartments

    11 x 1 and 2 bedroom units

    22M Ideal for investment
    1. THIKA

    CHANIA GARDENS

    Bungalow

    3 bedroom

    9M
    1. UPPER HILL

    (Near World Bank)

    HIGHRISE APARTMENTS

    3 bedroom

    750M 32 units; fully occupied with a rental income of 3.85M monthly
    1. VILLA FRANCA

    (shopping centre)

    MIXED DEVELOPMENT

    Ground floor: commercial unit

    1st floor: 3 bedroom apartment

    8M Commercial unit already let, with good income
    1. WESTLANDS

    (Mpaka Road)

    ONE WEST PARK

    2 bedrooms

    3 bedrooms

    4 bedrooms

    27.1 – 28.75M32.25 – 35.75M

    38 – 40.75M

    Construction on-goingCompletion: January 2014
    1. WESTLANDS

    (Rhapta Road)

    STAND – ALONE VILLA (on 0.8 acres)

    7 bedroom

    185M Ideal for developer
    1. WESTLANDS

    (Mvuli Road)

    ELIXIR

    Apartments

    3 bedroom

    4 bedroom

    21M (cash buyer)22.5M (mortgage buyer)

    All sold out

    12 units (2,000 sq ft)3 units (3,300 sq ft)
    1. WESTLANDS

    (Brookside Drive)

    Brookside Gardens apartments

    4 bedroom with DSQ

    32MOr 170,000.00 to let 5 units left
    1. ZIMMERMAN

    (Roysambu-Kamiti Road)

    Block of flats

    2 and 3 bedrooms

    60M Rental income of 520,000 per month

    RENTALS

    LOCATION

    PROPERTY

    SIZE

    PRICE

    GIGIRI

    U. N. Crescent

    10 bedroom house

    USD 10,000

    IMARA DAIMA

    MAISONETTE

    2 Bedroom

    29,000 per month

    IMARA DAIMA

    2 bedroom apartment

    27,500 per month

    INDUSTRIAL AREA

    Enterprise Road A

    4,000 sq ft go down

    140,000 per month + 10,000 service charge

    KIKUYU

    SHOPPING CENTRE

    500 sq ft

    45,000 per month

    KILELESHWA

    (Suguta Rd)

    NGOLU APARTMENTS

    Block A
    -1 unit,2 bedrooms ( 85sqmt) on ground floor

    -6 units each 2 bedrooms (128 sq mt)-on 1st,2nd & 3rd floors

    -2 units-3 bedrooms (174 sq mt)- Attic-Upper duplex

    Block B
    -8 units, 4 bedroom (185sqmt)
    -2 units, 5 bedrooms (234 sqmt

    Block C
    -4 units, 3 bedrooms (185 sqmt
    -1 unit, 4 bedrooms (232 sqmt)

    -4 units, 2 bedrooms (153 sqmt )
    – 1 unit, 3 bedrooms (200 sqmt)

    1 bedroom furnished

    2 bedrooms furnished

    50,000 per month

    70,000 per month

    100,000 per month

    150,000 per month

    200,000 per month

    100,000 per month

    150,000 per month

    70,000 per month

    100,000 – 250,000 per month

    100,000 per month

    120,000 per month

     

    KILELESHWA

    Eagle Court

    3 bedroom apartment

    Studio apartment

    150,000 per month

    7,500 per day

    60,000 per month

    KILELESHWA

    Junction of Ole Kejuado and Nyeri Road

    3 bedroom apartment

    100,00 per month

    KILELESHWA, Siaya Road

    Apartment

    3 bedroom with DSQ

    90,000 per month

    LANGATA ROAD, off Kungu Karumba Rd.

    PARK GARDENS

    2 bedrooms, one ensuite.

    35,000 per month

    MADARAKA

    Furnished apartment

    2 bedroom apartment (Fully equipped kitchen, internet access, TV, towels & sheets provided, transfer and car hire available on request, and maid service

    80,000 monthly

    21,000 weekly

    3,000 daily

    MADARAKA ESTATE

    APARTMENT

    2 bedroom, fully furnished

    80,000 per month

    21,000 per week

    3,000 daily

    MOMBASA ROAD

    Office, opposite City Cabanas and on tarmac. On 2nd floor

    2,500 sq ft

    75.00 per sq ft per month , inclusive of service charge

    MOMBASA ROAD

    Office, opposite Gateway Park

    On 4th floor

    1,987 sq ft

    50.00 per sq ft per month , inclusive of service charge

    MOMBASA ROAD

    Office, opposite JKIA exit

    1,500 – 3,500 sq ft70.00 per sq ft per month , inclusive of VAT and service charge.

     

    Minimum lease 5years, 3 months; 3 months deposit and quarterly payments.

    MOMBASA ROAD

    North Airport Road

    5,400 sq ft go down

    220,000 per month, all inclusive

    MOMBASA ROD

    HONEY SUCKLE ESTATE

    5 bedroom maisonette, master en-suite

    35,000 per month

    3,000 service charge

    NGONG ROAD

    Morning Side

    Office space –

    351,000 per month

    NGONG ROAD, Riara Road

    Apartment

    3 bedroom

    90,000 + 5,000 service charge per month

    NYARI

    Next to the Nyari police post

    5 bedroom villa

    250,000 per month

    RIARA SPLENDOUR

    Apartments

    3 bedroom

    90,000 per month

    STATE HOUSE RD, near Arboretum Park

    Apartment

    2 bedroom

    150,000 per month

    UPPER HILL

    ABCON HOUSE

    From 1,000 sq ft

    110/= per sq ft (+ service charge)

    UPPER HILL

    Serene Valley apartments

    2 bedroom

     

    3 bedroom

    150,000 per month

    180,00 per month

    UPPER HILL (Kolobot Drive)

    2 bedroom apartment, furnished

     

    2 bedroom apartment, unfurnished

    150,000 per month

     

    85,000 per month

     

    UPPER HILL (Kolobot Drive)

    Furnished and Serviced Apartments

    (Serviced: inclusive of electricity, water, internet &

    1 bedroom furnished, not serviced

     

    2 bedroom furnished and serviced

    2 bedroom, furnished and not serviced

    3 bedroom furnished

    3 bedroom unfurnished

    90,000 per month

     

    160,000 per month

    120,000 per month

    170,000 per month

    130,000 per month

     

    UPPER HILL, near Geomaps

    APARTMENTS

    Pent house fully furnished
    4 bedroom fully furnished

    220,000 per month

    300,000 per month

     

    LAND FOR SALE

    AREAS

    LOCATION

    SIZE

    PRICE

    NOTES

    1. EMBAKASI

    Next to Pipeline

    33 x 66 sq ft

    2.8M

    1. GIGIRI

    After Rwandan Embassy

    3.5 acres

    400M

    Has an old 4 bedroom house

    1. GIGIRI

    Behind Village Market; rear entrance

    1 acre

    180M

    1. GIGIRI

    Opposite U.S. Embassy

    1 acre

    250M

    1. GIGIRI

    Gigiri Close

    0.8 acre

    90M

    1. GIGIRI

    Next to Turkish Embassy

    3 acres

    500M

    1. ISINYA

    KAJIADO

    8 acres

    800,000 per acre

    1. JUJA

    JKUAT flyover, proceed 7 Kms on Thika- Makongeni Bypass.

    20 acres

    2.7M per acre

    Ideal for estates as per the upcoming Daykio estate nearby

    1. JUJA

    Kisaju – 2kms off tarmac

    15 acres

    1.7m per acre

    Ideal for developers

    1. KAREN

    Near Karen country club

    2 parcels on 1 acre each

    32M per parcel

    1. KAREN

    Near Karen country club

    0.5 acre each

    25M per parcel

    1. KAREN

    Near Kenya School of Law

    30 acres

    30M per acre

    All the documents are ready

    1. KAREN

    Windy Ridge

    5 acres

    150M

    1. KAREN

    3km on the way to Dagoretti, 0.5km from main road

    8.7 acres

    105M

    1. KAREN

    Next to Banda School

    4.2 acres

    32M per acre

    1. KAREN

    Windy Ridge

    5 acres

    26M per acre

    Market price is 30M

    1. KERICHO

    6,000 acres

    1.4M per acre

    Has tea, school and factory on it.

    1. KIAMBU ROAD

    1st row, after and opposite Muthaiga Golf

    2.16 acres

    220M

    1. KIAMBU ROAD

    After Village Inn, near Starehe Girls

    62 acres

    25M per acre

    1. KILELESHWA

    Kandara Road

    0.75 acre

    120M

    Flat, on sewer – suitable for flats

    1. KILELESHWA

    Othaya Road

    0.8 acres

    140M

    1. KILIFI

    Fronting Sabaki River for 12 kms

    51,000 acres

    120,000 per acre

    1. KILIMANI

    Chaka Road, near Nyangumi Road

    1 acre

    250M

    1. KILIMANI

    Dennis Pritt Road

    1 acre

    185M

    1. KISERIAN

    Overlooking the upcoming dam

    5 – 10 acres

    3.5M per acre

    1. KISERIAN

    12 Km off Pipeline Road

    1/8th acres plots

    400,000.00 per plot

    Ideal for either residential or investment purposes

    1. KITENGELA

    Behind Yukos, 300m from the road

    50 x 100

    1.4M

    Clean title, all weather road

    1. KYUNA

    3 acres

    370M

    1. LAVINGTON

    Touching Kingara Rd

    1.075 acres

    190M

    Flat, on sewer – suitable for flats

    1. LAVINGTON

    Diani Road

    0.9 acres

    185M

    1. LAVINGTON

    Gitanga Road

    0.5 acre

    90M

    1. LAVINGTON

    Ngecha Road

    1 acre

    80M

    1. LAVINGTON

    Gitanga Road

    1 acre

    165M

    1. LENANA RD

    1 acre

    230M

    1. MACHAKOS

    Behind Lukenya Hills, 1 Km off Mombasa Rd

    8 acres

    3M per acre

    Accessed by a private road

    1. MOMBASA

    Msawambeni, on beach

    10 acres

    9M per acre

    1. MOMBASA

    South Coast, on beach

    10 acres

    110M

    Ideal to put up a resort

    1. MOMBASA ROAD

    Next to Nation Printers

    Upto 70 acres

    50M

    Prime property for developer

    1. MOMBASA ROAD

    Athi River, touching tarmac

    2.5 acres

    75M

    Prime property for developer

    1. MOMBASA ROAD

    Sabaki Area

    0.125 acres

    1.3M

    Fast growing area, ideal for residential use

    1. MOMBASA ROAD
    Behind Gables Park apartments and next to 3600 Apartments

    0.25 acres

    15M

    Ideal for a developer

    1. MOMBASA ROAD

    Behind Airtel

    10 acres

    42M per acre

    1. NAIROBI

    LORESHO

    2 ½ acre

    200M

    Ideal for developer

    1. NAIROBI

    SPRING VALLEY

    4.5 acres

    1. NGONG ROAD

    Ndemi Road (after Adams Roundabout)

    0.5 acre

    150M (negotiable)

    1. NGONG ROAD

    Touching 2nd & 3rd Ngong Avenue

    1 acre

    330M

    1. NGONG ROAD

    Kabaranet Road, behind Uchumi

    0.7 acre

    240M (negotiable)

    Suitable for tall flats

    1. NGONG ROAD

    200m from Adams

    1 acre

    350M (negotiable)

    1. NYERI

    Near the CBD

    0.5 acres

    10M

    1. OLD MUTHAIGA
    OPPOSITE Gertrude’s Hospital

    4.5 acres

    USD 10M

    1. OLD MUTHAIGA

    With a 4br bungalow

    0.75 acre

    200M or to let for 380,000 per month

    1. OLD RUNDA

    1.5 acres

    70M

    1. PARKLANDS

    1st Avenue, near MP Shah Hospital

    0.25 acre

    80M

    1. PARKLANDS

    2nd Avenue

    0.5 acres

    130M

    1. REDHILL

    15 acres

    9.5M per acre

    Market price is 14M

    1. RONGAI

    Touching the tarmac

    1 acre

    25M (negotiable)

    Ideal for commercial venture

    1. RONGAI

    Tuala Centre

    50 x 100

    900,000

    Ideal for residential use. Each has a title

    1. RUIRU

    9 kms off Thika Superhighway

    140

    8M per acre (negotiable)

    1. RUIRU

    Next to Tatu City

    420 acres in 3 parcels of 100 acres and 1 of 120 acres

    8M per acre

    1. RUIRU

    139 acres

    9M per acre

    1. RUNDA

    Kigwaru

    7 parcels of 0.5 acre each

    18M per parcel

    1. RUNDA

    Runda Water

    2 acres

    120M

    1. RUNDA WATER

    2 acres

    125M

    1. THIGIRI RIDGE

    1 acre

    56M

    1. THIKA

    Juja

    850 acres

    6M per acre

    1. UPPERHILL

    Next to Equity Bank

    2.4 acres

    800M

    1. UPPERHILL

    Kilimanjaro Road

    1.7 acres

    750M

    1. UPPERHILL

    Near British High Commission

    4 acres

    450M per acre

    1. VALLEY ARCADE

    Mbaazi Road

    1.01 acre

    180M

    1. WAIYAKI WAY

    Near St. Mark’s church

    1 acre

    360M

    1. WESTLANDS

    Behind Corner Plaza, next to 9 West

    0.77 acre

    350M

    For commercial use

    1. WESTLANDS

    Off Peponi Road

    4.5 acres

    700M

  • Kenya Land for sale June 2013

    COMMERCIAL PROPERTIES

    LOCATION PROPERTY MIN. AVAILABLE SIZE (FT) PRICE PER SQ FEET NOTES
    1. INDUSTRIAL AREA

    (Commercial Street)

    Godown on 0.5acre 25,000 150M
    1. KILIMANI (Lenana Road/Arwings Kodhek)
    SIFA TOWER 850 12,500 + 1 parking per 1,000 sq ft Completion in June 2014
    1. MOMBASA ROAD

    (former St. James hospital site)

    NEXTGEN PARK

    • Shops and offices
    • Doctors Plaza
     

    1,000

    500

     

    Prices available on request

    Prices are gross and size dependant on floor  and purpose i.e. supermarket , office or shop

    Construction on-going

    1. NAIROBI CBD
    Tom Mboya Street 250M Has 8 floors, fully occupied
    1. NAKURU TOWN
    MALL 250M
    1. NGONG ROAD

    (Opposite Nakumatt Prestige)

    JADALA PLACE 1,000 13,500 +1,250,000 parking
    1. PARKLANDS

    (Parklands Rd, opp. Post office)

    PARK SUITES 533 14,500 + 1.5M parking Construction on-going
    1. PARKROAD
    1 COMMERCIAL BUILDING 2 shops and 18 rooms. 25M (negotiable) Fully occupied with monthly income of Ksh. 124,300.00
    1. UPPERHILL

    (Next to Traffic police)

    FORTIS TOWERS 1,000 19,000 + 1.5m Parking Construction on-going
    1. WESTLANDS

    (Waiyaki Way, near ABC place)

    THE ADDRESS 1,826 14,000 per sq ft and 1.25M parking One tower, overlooking Muthangari. Ground-breaking in July 2013
    1. WESTLANDS

    (Chiromo Lane)

    LOTUS PLAZA 2,000 14,500 per sq ft

    80.00 to rent per sq ft

    6,700 sq ft floor space x 3 floors
    1. WESTLANDS,

    (Karuna Road)

    WESTERN HEIGHTS 500 15,000 for typical floor and 20,000 for ground floor + 1.5M parking Construction on-going
    1. WESTLANDS, CHIROMO LANE
    MIRAGE 1,000 16,000 + 1.5M parking

     

    Construction on-going, one tower sold, out NEAR ARM

     

    RESIDENTIAL PROPERTIES

    LOCATION

    PROPERTY

    SIZE (BEDROOMS)

    PRICE NOTES
    1. ATHI RIVER

    EVEREST

    1 bedroom

    2 bedrooms

    3 bedrooms

    2.6M

    4.2M

    5.7M

    120 units

    60 units

    60 units

    1. EMBAKASI

    Behind Imara Daima, opp. Transami

    Block of flats

    • 11 units, 1 bed
    • 43 units, studio
    • 2 shops
    35M (negotiable) Rental income of 324,500 per month
    1. GIGIRI

    (behind UNEP)

    Stand alone mansion

    5 bedroom

    85M
    1. HILLVIEW

    4 townhouses

    5 bedroom

    75M each On 1 acre

    With a ready embassy client. Income of 1.2M monthly

    1. IMARA DAIMA

    Sunrise Estate

    3 bedroom apartment

    6.5M Next to Riara Springs school
    1. IMARA DAIMA

    Penthouse

    2 bedroom apartment

    4.5M Available immediately
    1. IMARA DAIMA

    (Catherine Ndereva Drive)

    Apartment

    2 bedroom

    4.5M 22 units in apartment block
    1. JUJA, THIKA ROAD

    Bungalow

    3 bedroom

    6.5M ON 0.125 acre
    1. KABETE

    Kabete Green Villas

    3 bedrooms

    4 bedrooms

    65M

    75M

    12 units on 5 acres
    1. KAHAWA WENDANI

    Block of apartments

    20 units,1 bedroom

    10 units, 2 bedroom

    6 units, 3 bedroom

     

    150M

    1. KAREN

    Karen Palms

    4 bedrooms

    42M 5 units only
    1. KAREN

    (Kerarapon Drive)

    Baraka Park

    Detached maisonettes

    4 bedroom

    25.5M 25 units
    1. KAREN

    (Windy Ridge)

    STAND ALONE

    4 bedroom, 3 ensuite + 3 DSQ

    51M On 1 acre
    1. KAREN

    (Ndege Road)

    STAND ALONE

    5 bedroom

    70M On 1.5 acre
    1. KAREN

    Townhouse

    4 bedroom

    48M Near Karen country club
    1. KAREN

    (near Karen hospital)

    Townhouse

    4 bedrooms

    28M
    1. KAREN, Miotoni

    Villa

    4 bedroom

    54M On 0.5 acre
    1. KASARANI

    Mwiki

    Block of flats

    • 8 units, 2 bed
    • 2 shops
    13.9M Rental income of 120,000 per month
    1. KIAMBU  ROAD

    FIVE STAR MEADOWS

    Country Villas

    3 bed  (2,280 sq ft)

    4 bed (2,830 sq ft)

    22.95M

    29.95M

    Each on 1/8th acre
    1. KIANDA

    Kianda Gardens

    Townhouses

    3 bedroom + DSQ

    41M

    3,250 SQ FT
    1. KIKUYU

    Ivory Towers

    apartments

    2 bedrooms

    3 bedrooms

    7.5M

    9.5M

    Ready for occupation – completed October 2012
    1. KIKUYU

    SHAKIWA GARDENS apartments

    2 bedrooms

    3 bedrooms

    4.8M

    6.0M

    Rent: 22,000 p.m.

    Rent: 27,500 p.m.

    1. KILELESHWA

    Gateway Apartments

    3 bedrooms

    17.5M
    1. KILELESHWA

    Penthouse

    2 bedrooms

    15.5M Rental income of 88,000 p.m.
    1. KILELESHWA

    NGOLU HEIGHTS

    2 bedroom

    3 bedroom

    3 w/en-suite guest

    3 duplex attic

    4 duplex attic

    4w/en-suite guest duplex attic

    • 15m
    • 16m
    • 18m
    • 17m
    • 19m
    • 19.5m
    • 134 Sq mt
    • 185 Sq mt
    • 185 Sq. mt
    • 174 Sq. mt
    • 239 Sq. mt
    • 236 Sq. mt
    1. KILELESHWA

    4 bedroom apartment

    15.2M
    1. KILELESHWA

    Kijani Willows

    Townhouses

    5 bedrooms

    40M 15 units on 1.6 acres
    1. KILELESHWA

    Town house

    22M
    1. KILELESHWA (Ole Kejuado/Nyeri Rd junction)

    Apartments

    3 bedroom with DSQ

    18M Rental income of 100,000 p.m.
    1. KILIMANI

    (Riara Lane)

    Apartment

    4 bedrooms

    18M
    1. KILIMANI

    Karue Court apartment

    3 bedrooms

    16.5M
    1. KISERIAN
    MORA HILL

    Detached townhouse

    4 bedroom

    13.5M 19 units in total
    1. KISERIAN

    Mora Hill

    4 bedroom bungalow

    13.5M
    1. KITUSURU

    Villa

    5 bedroom, all en-suite, 3 DSQ

    75M
    1. LANGATA

    Langata Park Estate

    5 units of 2 bedrooms flats

    18M Monthly income of Ksh. 100,000
    1. LANGATA

    (Off Amiani Road)

    CHEKULO VILLAS

    Semi-detached town houses

    4 bedroom with self contained DSQ

    20M Beginning stages. On about 1/8th acre each
    1. LAVINGTON

    (Mbaazi Avenue)

    Apartment

    4 bedrooms

    18.5M
    1. LAVINGTON

    Penthouse

    4 bedrooms

    22M 2 bedrooms en-suite with attic level
    1. LAVINGTON

    LAVINGTON VILLAS

    5 bedroom with attic

    52M 2 out of 3 units remaining not inclusive of the main house
    1. LAVINGTON

    (Chalbi Drive)

    PYRAMID

    Townhouses

    5 bedroom

    52M

    6 units in the compound

    1. LAVINGTON

    (Apple Cross Rd)

    PYRAMID SPRINGS

    5 bedroom + study and 2 DSQ

    42M

    3 levels, 9 units on 1.3 acres. Ground breaking stages

    1. LAVINGTON

    Apartment

    4 bedrooms

    33M
    1. LAVINGTON

    (Kabasarian Drive)

    Mansion

    12 bedroom

    120M On 0.75 acres
    1. LAVINGTON

    (Masanduku Lane)

    Apartment

    3 bedrooms

    16M In a compound of 32 units
    1. LORESHO

    Villa

    4 bedroom + 2 DSQ

    70M On 0.5 acre
    1. MLOLONGO

    Vallley View Estate

    3 bedroom bungalow

    5.5M
    1. MLOLONGO

    Bungalow

    3 bedroom

    6M
    1. MOMBASA

    Bamburi Flats

    18 x 1 bedroom

    38M Ideal for investment
    1. MOMBASA

    Milele Luxury apartments

    1 bedroom

    2 bedrooms

    3 bedrooms

    20M

    24M

    28M

    1. MOMBASA RD

    (former St. James Hospital site)

    NEXTGEN PARK

    1 bedroom

    2 bedroom

    3 bedroom

    2 bedroom deluxe

    10.5 – 12M

    15.5 – 17M

    24.0 – 26.0M

    17.0M – 18.5M

    Show houses ready

    (Prices vary according to floor)

    1. MOMBASA ROAD

    (Muthamia Heights Rd.)

    Zen Ruby Apartments

    1 bedroom

    2 bedrooms

    3 bedrooms

    3 M

    5M

    6M

    1. MOMBASA ROAD

    Maisonette

    4 bedrooms

    11.5M
    1. MOMBASA ROAD

    OYSTER BREEZE

    Apartments

    3 bedroom

    9M 15 units; 2,000 sq. ft
    1. MOMBASA ROAD

    Honey Suckle Apartments

    3 bedroom apartment

    5.0M
    1. MOMBASA ROAD

    Muthama Heights Apartments

    3 bedroom + DSQ

    8.5M
    1. MOMBASA ROAD

    Green Park Bungalows

    4 bedroom

    9.2M On 0.25 acre, with rental income of 45,000
    1. MOMBASA ROAD

    Maisonette

    4 bedroom

    12.5M
    1. MOMBASA ROAD

    Maisonette

    3 bedroom

    10.5M
    1. MOMBASA ROAD (Mlolongo)

    Block of flats

    1 bedroom and single units

    16M Monthly rental income of 144,000 on the 2 completed floors
    1. MOMBASA ROAD, near JKIA Resort

    FIVE STAR GARDENS

    2 bedroom (830 sq ft) 3 bedroom (1130 sq ft)

    5M

    7M

    313 units within 5 courts on 5 acres
    1. NAIVASHA

    SHWARI COUNTRY HOMES

    Exotic 3-bedroom

    23M 4 homes set on a 10-acres ranch
    1. NAIVASHA ROAD

    (Wanyee Road)

    Apartment

    3 bedroom

    8.5M 150 SQM, with rental income of 45,000
    1. NGONG ROAD

    (After Junction)

    Apartments to let

    2 bedrooms

    3 bedrooms

    3 bedroom + DSQ

    57,000 per month

    72,000 per month

    77,000 per month

    91 SQ M

    141 SQ M

    1. PARKLANDS

    (6TH Avenue)

    Muthaiga Heights

    3 bedrooms

    25M – 35M Type A : 1,615 sq ft

    Type B:  2,100 sq ft

    Type C : 2,283 sq ft

    1. PARKLANDS

    CITY PARK APARTMENTS

    3 bedroom with DSQ

    18M Beginning stages
    1. PARKLANDS

    Apartments

    4 bedroom

    3 bed penthouses,

    23.5M
    1. RIVERSIDE

    Stand-alone house

    6 bedrooms

    130M On 0.387 acres; with gym, Jacuzzi, sauna
    1. RIVERSIDE

    Villa

    5 bedroom, all ensuite, 3 DSQ

    82M On 0.5 acre
    1. RUIRU

    Monarch Apartments

    2 bedrooms, master en-suite

    3 bedrooms, master en-suite

    Cash: 5.57M Installments: 5.79M

    Cash: 6.5M Installments: 6.75M

    Mortgage available @ 6M

    Mortgage available @ 7M

    1. RUNDA

    Runda Meadows

    4 bedrooms

    65M Single unit
    1. RUNDA

    Runda Grove

    5 bedroom house

    65M On 0.5 acre
    1. SOUTH B

    Great Wall apartments

    2 bedrooms

    3.9M
    1. SOUTH B

    (Opposite Ole-Sereni)

    Apartments

    3 bedroom

    8M Rental income of 50,000 per month
    1. SOUTH C

    Medina Park

    3 bedroom apartment

    7.5M 3 units available, income of 30,000 per month each
    1. SPRING V ALLEY

    River View villa

    4 bedrooms

    105M On 0.5 acre
    1. SPRING VALLEY

    (Opposite Police Station)

    Mansion

    5 bedroom house

    90M On 0.5 acre
    1. TENA ESTATE

    Apartments

    11 x 1 and 2 bedroom units

    22M Ideal for investment
    1. THIKA

    CHANIA GARDENS

    Bungalow

    3 bedroom

    9M
    1. UPPER HILL

    (Near World Bank)

    HIGHRISE APARTMENTS

    3 bedroom

    750M 32 units; fully occupied with a rental income of 3.85M monthly
    1. VILLA FRANCA

    (shopping centre)

    MIXED DEVELOPMENT

    Ground floor: commercial unit

    1st floor: 3 bedroom apartment

    8M Commercial unit already let, with good income
    1. WESTLANDS

    (Mpaka Road)

    ONE WEST PARK

    2 bedrooms

    3 bedrooms

    4 bedrooms

    27.1 – 28.75M

    32.25 – 35.75M

    38 – 40.75M

    Construction on-going

    Completion: January 2014

    1. WESTLANDS

    (Rhapta Road)

    STAND – ALONE  VILLA (on 0.8 acres)

    7 bedroom

    185M Ideal for developer
    1. WESTLANDS

    (Mvuli Road)

    ELIXIR

    Apartments

    3 bedroom

    4 bedroom

    21M (cash buyer)

    22.5M (mortgage buyer)

     

    All sold out

    12 units (2,000 sq ft)

     

    3 units (3,300 sq  ft)

    1. WESTLANDS

    (Brookside Drive)

    Brookside Gardens apartments

    4 bedroom with DSQ

    32M

    Or  170,000.00 to let

    5 units left
    1. ZIMMERMAN

    (Roysambu-Kamiti Road)

    Block of flats

    2 and 3 bedrooms

    60M Rental income of 520,000 per month

    RENTALS

    LOCATION

    PROPERTY

    SIZE

    PRICE

    GIGIRI

    U. N. Crescent

    10 bedroom house

    USD 10,000

    IMARA DAIMA

    MAISONETTE

    2 Bedroom

    29,000 per month

    IMARA DAIMA

    2 bedroom apartment

    27,500 per month

    INDUSTRIAL AREA

    Enterprise Road A

    4,000 sq ft go down

    140,000 per month + 10,000 service charge

    KIKUYU

    SHOPPING CENTRE

    500 sq ft

    45,000 per month

    KILELESHWA

    (Suguta Rd)

    NGOLU APARTMENTS

    Block A
    -1 unit,2 bedrooms ( 85sqmt) on ground floor

    -6 units each 2 bedrooms (128 sq mt)-on 1st,2nd & 3rd floors

    -2 units-3 bedrooms (174 sq mt)- Attic-Upper duplex

    Block B
    -8 units, 4 bedroom (185sqmt)
    -2 units, 5 bedrooms (234 sqmt

    Block C
    -4 units, 3 bedrooms (185 sqmt
    -1 unit, 4 bedrooms (232 sqmt)

    -4 units, 2 bedrooms (153 sqmt )
    – 1 unit, 3 bedrooms (200 sqmt)

    1 bedroom furnished

    2 bedrooms furnished

    50,000 per month

    70,000 per month

    100,000 per month

    150,000 per month

    200,000 per month

    100,000 per month

    150,000 per month

    70,000 per month

    100,000 – 250,000 per month

    100,000 per month

    120,000 per month

    KILELESHWA

    Eagle Court

    3 bedroom apartment

    Studio apartment

    150,000 per month

    7,500 per day

    60,000 per month

    KILELESHWA

    Junction of Ole Kejuado and Nyeri Road

    3 bedroom apartment

    100,00 per month

    KILELESHWA, Siaya Road

    Apartment

    3 bedroom with DSQ

    90,000 per month

    LANGATA ROAD, off Kungu Karumba Rd.

    PARK GARDENS

    2 bedrooms, one ensuite.

    35,000 per month

    MADARAKA

    Furnished apartment

    2 bedroom apartment (Fully equipped kitchen, internet access, TV, towels & sheets provided, transfer and car hire available on request, and maid service

    80,000 monthly

    21,000 weekly

    3,000 daily

    MADARAKA ESTATE

    APARTMENT

    2 bedroom, fully furnished

    80,000 per month

    21,000 per week

    3,000 daily

    MOMBASA ROAD

    Office, opposite City Cabanas and on tarmac. On 2nd floor

    2,500 sq ft

    75.00 per sq ft per month , inclusive of service charge

    MOMBASA ROAD

    Office, opposite Gateway Park

    On 4th floor

    1,987 sq ft

    50.00 per sq ft per month , inclusive of service charge

    MOMBASA ROAD

    Office, opposite JKIA exit

    1,500 – 3,500 sq ft 70.00 per sq ft per month , inclusive of VAT and service charge.

    Minimum lease 5years, 3 months; 3 months deposit and quarterly payments.

    MOMBASA ROAD

    North Airport Road

    5,400 sq ft go down

    220,000 per month, all inclusive

    MOMBASA ROD

    HONEY SUCKLE ESTATE

    5 bedroom maisonette, master en-suite

    35,000 per month

    3,000 service charge

    NGONG ROAD

    Morning Side

    Office space –

    351,000 per month

    NGONG ROAD, Riara Road

    Apartment

    3 bedroom

    90,000 + 5,000 service  charge per month

    NYARI

    Next to the Nyari police post

    5 bedroom villa

    250,000 per month

    RIARA SPLENDOUR

    Apartments

    3 bedroom

    90,000 per month

    STATE HOUSE RD, near Arboretum Park

    Apartment

    2 bedroom

    150,000 per month

    UPPER HILL

    ABCON HOUSE

    From 1,000 sq ft

    110/= per sq ft (+ service charge)

    UPPER HILL

    Serene Valley apartments

    2 bedroom

    3 bedroom

    150,000 per month

    180,00 per month

    UPPER HILL (Kolobot Drive)

    2 bedroom apartment, furnished

    2 bedroom apartment, unfurnished

    150,000 per month

    85,000 per month

    UPPER HILL (Kolobot Drive)

    Furnished and Serviced Apartments

    (Serviced: inclusive of electricity, water, internet &

    1 bedroom furnished, not serviced

    2 bedroom  furnished and serviced

    2 bedroom, furnished and not serviced

    3 bedroom furnished

    3 bedroom unfurnished

    90,000 per month

    160,000 per month

    120,000 per month

    170,000 per month

    130,000 per month

    UPPER HILL, near Geomaps

    APARTMENTS

    Pent house fully furnished
    4 bedroom fully furnished

    220,000 per month

    300,000 per month

    LAND FOR SALE

    AREAS

    LOCATION

    SIZE

    PRICE

    NOTES

    1. EMBAKASI

    Next to Pipeline

    33 x 66 sq ft

    2.8M

    1. GIGIRI

    After Rwandan Embassy

    3.5 acres

    400M

    Has an old  4 bedroom house

    1. GIGIRI

    Behind Village Market; rear entrance

    1 acre

    180M

    1. GIGIRI

    Opposite U.S. Embassy

    1 acre

    250M

    1. GIGIRI

    Gigiri Close

    0.8 acre

    90M

    1. GIGIRI

    Next to Turkish Embassy

    3 acres

    500M

    1. ISINYA

    KAJIADO

    8 acres

    800,000 per acre

    1. JUJA

    JKUAT flyover, proceed 7 Kms on Thika- Makongeni  Bypass.

    20 acres

    2.7M per acre

    Ideal for estates as per the upcoming Daykio estate nearby

    1. JUJA

    Kisaju – 2kms off tarmac

    15 acres

    1.7m per acre

    Ideal for developers

    1. KAREN

    Near Karen country club

    2 parcels on 1 acre each

    32M per parcel

    1. KAREN

    Near Karen country club

    0.5 acre each

    25M per parcel

    1. KAREN

    Near Kenya School of Law

    30 acres

    30M per acre

    All the documents are ready

    1. KAREN

    Windy Ridge

    5 acres

    150M

    1. KAREN

    3km on the way to Dagoretti, 0.5km from main road

    8.7 acres

    105M

    1. KAREN

    Next to Banda School

    4.2 acres

    32M per acre

    1. KAREN

    Windy Ridge

    5 acres

    26M per acre

    Market price is 30M

    1. KERICHO

    6,000 acres

    1.4M per acre

    Has tea, school and factory on it.

    1. KIAMBU ROAD

    1st row, after and opposite Muthaiga Golf

    2.16 acres

    220M

    1. KIAMBU ROAD

    After Village Inn, near Starehe Girls

    62 acres

    25M per acre

    1. KILELESHWA

    Kandara Road

    0.75 acre

    120M

    Flat, on sewer – suitable for flats

    1. KILELESHWA

    Othaya Road

    0.8 acres

    140M

    1. KILIFI

    Fronting Sabaki River for 12 kms

    51,000 acres

    120,000 per acre

    1. KILIMANI

    Chaka Road, near Nyangumi Road

    1 acre

    250M

    1. KILIMANI

    Dennis Pritt Road

    1 acre

    185M

    1. KISERIAN

    Overlooking the upcoming dam

    5 – 10 acres

    3.5M per acre

    1. KISERIAN

    12 Km off Pipeline Road

    1/8th acres plots

    400,000.00 per plot

    Ideal for either residential or investment purposes

    1. KITENGELA

    Behind Yukos, 300m from the road

    50 x 100

    1.4M

    Clean title, all weather road

    1. KYUNA

    3 acres

    370M

    1. LAVINGTON

    Touching Kingara Rd

    1.075 acres

    190M

    Flat, on sewer – suitable for flats

    1. LAVINGTON

    Diani Road

    0.9 acres

    185M

    1. LAVINGTON

    Gitanga Road

    0.5 acre

    90M

    1. LAVINGTON

    Ngecha Road

    1 acre

    80M

    1. LAVINGTON

    Gitanga Road

    1 acre

    165M

    1. LENANA RD

    1 acre

    230M

    1. MACHAKOS

    Behind Lukenya Hills, 1 Km off Mombasa Rd

    8 acres

    3M per acre

    Accessed by a private road

    1. MOMBASA

    Msawambeni, on beach

    10 acres

    9M per acre

    1. MOMBASA

    South Coast, on beach

    10 acres

    110M

    Ideal to put up a resort

    1. MOMBASA ROAD

    Next to Nation Printers

    Upto 70 acres

    50M

    Prime property for developer

    1. MOMBASA ROAD

    Athi River, touching tarmac

    2.5 acres

    75M

    Prime property for developer

    1. MOMBASA ROAD

    Sabaki Area

    0.125 acres

    1.3M

    Fast growing area, ideal for residential use

    1. MOMBASA ROAD
    Behind  Gables Park apartments and next to 3600 Apartments

    0.25 acres

    15M

    Ideal for a developer

    1. MOMBASA ROAD

    Behind Airtel

    10 acres

    42M per acre

    1. NAIROBI

    LORESHO

    2 ½ acre

    200M

    Ideal for developer

    1. NAIROBI

    SPRING VALLEY

    4.5 acres

    1. NGONG ROAD

    Ndemi Road (after Adams Roundabout)

    0.5 acre

    150M (negotiable)

    1. NGONG ROAD

    Touching 2nd & 3rd Ngong Avenue

    1 acre

    330M

    1. NGONG ROAD

    Kabaranet Road, behind Uchumi

    0.7 acre

    240M (negotiable)

    Suitable for tall flats

    1. NGONG ROAD

    200m from Adams

    1 acre

    350M (negotiable)

    1. NYERI

    Near the CBD

    0.5 acres

    10M

    1. OLD MUTHAIGA
    OPPOSITE Gertrude’s Hospital

    4.5 acres

    USD 10M

    1. OLD MUTHAIGA

    With a 4br bungalow

    0.75 acre

    200M or to let for 380,000 per month

    1. OLD RUNDA

    1.5 acres

    70M

    1. PARKLANDS

    1st Avenue, near MP Shah Hospital

    0.25 acre

    80M

    1. PARKLANDS

    2nd Avenue

    0.5 acres

    130M

    1. REDHILL

    15 acres

    9.5M per acre

    Market price is 14M

    1. RONGAI

    Touching the tarmac

    1 acre

    25M (negotiable)

    Ideal for commercial venture

    1. RONGAI

    Tuala Centre

    50 x 100

    900,000

    Ideal for residential use. Each has a title

    1. RUIRU

    9 kms off Thika Superhighway

    140

    8M per acre (negotiable)

    1. RUIRU

    Next to Tatu City

    420 acres in 3 parcels of 100 acres and 1 of 120 acres

    8M per acre

    1. RUIRU

    139 acres

    9M per acre

    1. RUNDA

    Kigwaru

    7 parcels of 0.5 acre each

    18M per parcel

    1. RUNDA

    Runda Water

    2 acres

    120M

    1. RUNDA WATER

    2 acres

    125M

    1. THIGIRI RIDGE

    1 acre

    56M

    1. THIKA

    Juja

    850 acres

    6M per acre

    1. UPPERHILL

    Next to Equity Bank

    2.4 acres

    800M

    1. UPPERHILL

    Kilimanjaro Road

    1.7 acres

    750M

    1. UPPERHILL

    Near British High Commission

    4 acres

    450M per acre

    1. VALLEY ARCADE

    Mbaazi Road

    1.01 acre

    180M

    1. WAIYAKI WAY

    Near St. Mark’s church

    1 acre

    360M

    1. WESTLANDS

    Behind Corner Plaza, next to 9 West

    0.77 acre

    350M

    For commercial use

    1. WESTLANDS

    Off Peponi Road

    4.5 acres

    700M