CEILING TYPES IN KENYA.
CEILING TYPES IN KENYA. A house ceiling is the part viewed from the building interior upwards under the roofing material. In recent years, new ceiling materials have emerged such as the uPVC, copper and vinyl suspended ceilings. The budget, aesthetic taste of the house owner/user and the usage of the room will determine the type…
-
EFFECTS OF MERGER OF MINISTRY OF LANDS WITH MINISTRY OF HOUSING IN KENYA.
EFFECTS OF MERGER OF MINISTRY OF LANDS WITH MINISTRY OF HOUSING IN KENYA. The current set up by the Uhuru Kenyatta Presidency whereby the Ministry of Lands has been joined together with Ministry of Housing and Urban Development is a very good move that will enable implementing policy such as envisioned in the Land Commission.…
-
PERCENTAGE OF COST BREAKDOWN BETWEEN LABOUR, MATERIALS AND CONTRACTOR PROFIT IN CONSTRUCTION.
PERCENTAGE OF COST BREAKDOWN BETWEEN LABOUR, MATERIALS AND CONTRACTOR PROFIT IN CONSTRUCTION. PROFIT. In large constructions costing kes 500m and above, a modest profit of between 10 to 20% is desirable. These are projects such as 6 storey and above high rise buildings in major towns such as in UpperHill area and over 10km long…
-
Unique furniture at Hurlingham office.
Office desk Office desk and office waiting bench Office wall shelf
-
JOINT VENTURE PROJECT, NGONG ROAD BEHIND UCHUHI HYPER.
Joint Venture Project along Joseph Kangethe road, off Ngong Road, Nairobi. 2 bedrm units @ 110m2 each.kes 11m sale price. Cost Item Kshs % Land 55,000,000.00 34.47843531 Preliminary 400,000.00 0.250752257 Construction 77,000,000.00 48.26980943 External Works 3,850,000.00 2.413490471 Contingency 1,540,000.00 0.965396189 Professional fees 3,850,000.00 2.413490471 Project Management fees 770,000.00 0.482698094 Marketing 3,250,000.00 2.037362086 Financial Charges 13,860,000.00…
-
JOINT VENTURE PROJECT, NGONG ROAD BEHIND UCHUHI HYPER.
Joint Venture Project along Joseph Kangethe road, off Ngong Road, Nairobi. 2 bedrm units @ 110m2 each.kes 11m sale price. Cost Item Kshs % Land 55,000,000.00 34.47843531 Preliminary 400,000.00 0.250752257 Construction 77,000,000.00 48.26980943 External Works 3,850,000.00 2.413490471 Contingency 1,540,000.00 0.965396189 Professional fees 3,850,000.00 2.413490471 Project Management fees 770,000.00 0.482698094 Marketing 3,250,000.00 2.037362086 Financial Charges 13,860,000.00…
-
Hurlingham furniture construction process
table office desk